Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Roofing work permitted June 3, 2025, with 13 permits through June 15, 2026, declaring $2,991,793 of work. Contractor on record: Macdonald Miller Facility Solutions LLC.
Mechanical equipment and ducting to support TI per plan
Seattle permit records name Macdonald Miller Facility Solutions LLC, Suppression Systems Inc. and Cosco Fire Protection as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
13 permits issued Jun 3 – Jun 15, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#7148067-EL Electrical · Electrical Low voltage automated gate system. Low voltage raceways for outdoor gate control systems. Line voltage from breaker is by others. Status: Issued | Not published | — | |
| applied Jun 12 | #7147817-RF Refrigeration · Trade Outdoor and Indoor Air Conditioning Unit | Supply and Return Refrigeration Lines Status: Issued | Macdonald Miller Facility Solutions LLC | — |
#7139965-EL Electrical · Electrical AIS-Verizon Seattle-114034464-01 CCTV and Intrusion System upgrades Status: Completed | Not published | — | |
#7136197-EL Electrical · Electrical AIS -Verizon Seattle, WA-114034464-01 Installation of Access control system. Status: Completed | Not published | — | |
#7134583-EL Electrical · Electrical Provide and install (1) new controller for Chiller and associated low volt wiring. -Provide and install (3) new controllers for monitor existing alarm points. -Install new communications to integrate (6) new HVAC equipment. -Provide low volt wiring for (2) new Fuel monitoring panel. -Provide and… Status: Completed | Macdonald Miller Facility Solutions LLC | — | |
| applied Aug 18 | #7101187-CN Addition/Alteration · Building Construct site improvements and install fuel tank at a commercial building per plan. Status: Issued | Not published | $100K |
| applied Jan 8 | #7124086-FS Fire Sprinkler and Suppression · Trade MODIFY EXISTING FIRE PROTECTION SYSTEMS TO ACCOMMODATE TENANT IMPROVEMENTS Status: Issued | Suppression Systems Inc. | $395K |
| applied Jan 9 | #7124102-EL Electrical · Electrical MODIFY LOW VOLTAGE DETECTION AND CONTROLS FOR CLEAN AGENT RELEASE AND BUILDING FIRE ALARM FUNCTIONS Status: Issued | Suppression Systems Inc. | $119K |
#7121821-FS Fire Sprinkler and Suppression · Trade TENANT IMPROVEMENT - Cosco Fire Protection to modify existing preaction system per NFPA 13, 2019 and City of Seattle. Status: Issued | Cosco Fire Protection | $47.5K | |
| applied Aug 18 | #7097004-CN Addition/Alteration · Building Construct alterations to existing telecommunications warehouse facility (Verizon) per plan. Status: Issued | Not published | $950K |
| applied Aug 18 | #7101209-ME Mechanical · Trade Mechanical equipment and ducting to support TI per plan Status: Issued | Not published | $1.1M |
| applied Nov 3 | #7115006-CN Addition/Alteration · Building Construct interior non-structural preparatory work (for work to be completed under separate permits) per plan STFI. Status: Issued | Not published | $130K |
#7088978-RR Roof · Roof The project entails for the reroofing of a section of the existing building. The balance of the rest of the building was re-roofed under a separate project in 2023. Status: Issued | Not published | $150K |