Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Hvac/Mechanical work permitted January 23, 2026, with 4 permits through August 25, 2026, declaring $72,531 of work. Contractor on record: Macdonald Miller Facility Solutions LLC.
REPLACE TWO (2) PACKAGED GAS ROOFTOP UNIT WITH PACKAGED HEAT PUMP ROOFTOP UNITS IN THE SAME LOCATION. DISCONNECT AND CAP EXISTING NATURAL GAS SUPPLY. UPDATE POWER WIRING AND DISCONNECT. per plans
Seattle permit records name Macdonald Miller Facility Solutions LLC as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Jan 23 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7159726-EL Electrical · Electrical Replace GP-7 and GP-8 with like-in-kind Status: Completed |
Commercial and multifamily, biggest first.
| — |
| applied Jul 16 | #7151497-ME Mechanical · Trade REPLACE TWO (2) PACKAGED GAS ROOFTOP UNIT WITH PACKAGED HEAT PUMP ROOFTOP UNITS IN THE SAME LOCATION. DISCONNECT AND CAP EXISTING NATURAL GAS SUPPLY. UPDATE POWER WIRING AND DISCONNECT. per plans Status: Completed | Macdonald Miller Facility Solutions LLC | $49.6K |
#7128540-EL Electrical · Electrical Status: Completed | Macdonald Miller Facility Solutions LLC | — |
| applied Dec 19 | #7121130-ME Mechanical · Trade Replace (1) packaged gas rooftop unit with packaged electric heat pump rooftop unit in same location. Disconnect and cap existing natural gas supply. Update power wiring and disconnect - per plans. Status: Issued | Macdonald Miller Facility Solutions LLC | $22.9K |
In Seattle, biggest first.