Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Francisco, CA
Multifamily General Building work permitted October 31, 2024, with 38 permits through October 28, 2026, declaring $1,634,182 of work. Contractor on record: Camp Roofing Ltd Dba Camp Construction.
Get new commercial permits near 94111 or San Francisco, free weekly email
(leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately.
San Francisco permit records name Camp Roofing Ltd Dba Camp Construction, City Building Inc. and Giampolini & Co Dba Giampolini/Courtney as the contractors on this project, among 6 contractors in all.
The contractor on 2 permits issued in the last 30 days is included with Pro.
See the contractor38 permits issued Oct 31 – Oct 28, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 2 | #202609027567 otc alterations permit install (n) mini split ac system at elevator equipment room. evaporative coils to be installed in the equipment room and condenser to be installed on the roof of the exterior of the building. connect power circuit to equipment and provide condensate drains from the evaporative coils to drain at roof Status: Issued | Contractor with Pro | $40K |
| applied Oct 9 | #202610099244 otc alterations permit lobby: mech work for 202604209709. exhaust fan and duct work. Status: Issued | Contractor with Pro | $19.6K |
| applied Apr 20 | #202604209709 otc alterations permit (leverl 1) t.i. includes interior re-finished of (e) residential tower main lobby. no change in use occupancy, occ. load or egress. replace in kind new front entry doors, new floor vocering and wall finishes. all new or revised mep's and life safety work will be design build and submited separately. Status: Issued | City Building Inc. | $400K |
| applied Jul 20 | #202607205245 otc alterations permit unit 1807- remodel (e) kitchen and (2) bathrooms. no removal of structural walls. install washer and dryer. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $114K |
| applied Jul 14 | #202607144972 otc alterations permit unit #1104: (1) kitchen, (1) bathroom remodel in kind, like for like. kitchen approximately 80sf, bathroom approximaltey 41sf. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $68.5K |
| applied May 28 | #202605282064 otc alterations permit unit #1001: (1) kitchen, (1) bathroom remodel in kind, like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied May 19 | #202605191553 otc alterations permit survery concrete patching and crack repairs at exterior walls and balconies. patching will be compelted at different levels of to exterior building elevation Status: Complete | Giampolini & Co Dba Giampolini/Courtney | $46.8K |
| applied Apr 28 | #202604280208 otc alterations permit unit#: 2208. one kitchen one bathroom remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $66.2K |
| applied Mar 10 | #202603107245 otc alterations permit unit #605: one bathroom one kitchen remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Feb 17 | #202602176003 otc alterations permit unit #702: one kitchen, one bathroom. remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Feb 12 | #202602125824 otc alterations permit demo existing sprinkler heads for removal of trash chute. repipe new supply for sprinklers in new trash chute on floors 3,5,7,9,11,13,15,17,19,21,23,25. sprinklers provied by trash chute contractor. (total heads 12) ref 2025-1126-0572 Status: Complete | Pribuss Engineering Inc | $12.6K |
| applied Jan 29 | #202601294813 otc alterations permit unit #2302: (1) kitchen, (1) bathroom remodel in kind, like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Jan 26 | #202601264502 otc alterations permit unit #1007 - one kitchen, one bathroom remodel in kind, like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Dec 18 | #202512182142 otc alterations permit unit #1301: (1) kitchen, (1) bathroom remodel in kind, like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $64K |
| applied Dec 18 | #202512182166 otc alterations permit unit #1102: one kitchen, one bathroom remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Dec 18 | #202512182177 otc alterations permit unit #602: one kitchen, one bathroom. remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Dec 11 | #202512111532 otc alterations permit unit 1002; one kitchen, one bathroom remodel in kind like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Dec 10 | #202512101376 otc alterations permit unit#604: rehabilitate existing kitchen and bathroom. no removal or structural walls Status: Complete | Camp Roofing Ltd Dba Camp Construction | $70.6K |
| applied Dec 4 | #202512041007 otc alterations permit unit #802: swap plumbing, electrical & finishes like for like. one kitchen and one bath remodel like for like. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $63.4K |
| applied Nov 24 | #202511240268 otc alterations permit unit#: 2008. rehabilitate existing kitchen and bathroom. no removal of structrual walls. Status: Issued | Camp Roofing Ltd Dba Camp Construction | $77.9K |
| applied Nov 26 | #202511260572 otc alterations permit maintenance and repair-replace existing trash chute with new discharge door and chute from basement through roof. remove and replace non-structural partitions with new rated partitions. no structural improvements, no increase in building area or conditioned space Status: Complete | C B 2 Builders Incorporated | $200K |
| applied Sep 18 | #202509185571 otc alterations permit unit 2205; rehabitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Sep 18 | #202509185575 otc alterations permit unit 1105; rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Sep 18 | #202509185573 otc alterations permit unit 2304; rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Sep 9 | #202509094870 otc alterations permit unit# 2408: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Sep 9 | #202509094867 otc alterations permit unit# 1605: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Jul 1 | #202507019901 otc alterations permit unit #25: rehabilitate existing kitchen and bathroom. no removal of structural walls. replace existing washer and dryer. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Apr 10 | #202502049656 additions alterations or repairs installing rooftop equipment for exterior building maintenance Status: Complete | Lynn Safety Inc. | $47.9K |
| applied Jun 12 | #202506128530 otc alterations permit unit 2403; rehabilitate exisintg kitchen and bathroom. no removal of structural walls. install washer and dryer. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $80K |
| applied Jul 5 | #202407055885 otc alterations permit unit # 2402: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Apr 10 | #202504104109 otc alterations permit unit 1201- remodel (e) kitchen and bathroom. no removal of structrual walls Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Apr 7 | #202504073809 otc alterations permit unit #803: rehabilitate existing kitchen and bathroom. no removal of structural walls. install washer and dryer. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Mar 20 | #202503202634 otc alterations permit unit #1504: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Mar 20 | #202503202636 otc alterations permit unit #808: rehabilitate (e) kitchen & bathroom. no removal of structural walls, no change in plumbing fixture count.cc Status: Issued | Camp Roofing Ltd Dba Camp Construction | $60K |
| applied Feb 27 | #202502271214 otc alterations permit unit 2306: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $65.8K |
| applied Nov 21 | #202411215475 otc alterations permit unit 1306- remodel (e) kitchen and bathjroom . no removal of structrual walls Status: Complete | Camp Roofing Ltd Dba Camp Construction | $70K |
| applied Oct 31 | #202410314084 otc alterations permit unit # 1601: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $67.5K |
| applied Oct 31 | #202410314086 otc alterations permit unit # 1904: rehabilitate existing kitchen and bathroom. no removal of structural walls. Status: Complete | Camp Roofing Ltd Dba Camp Construction | $67.5K |
In San Francisco, biggest first.