Multifamily General Building, Sign work permitted August 29, 2025, with 5 permits through April 6, 2026, declaring $208,821 of work. Contractor on record: Acco Engineered Systems Inc. Dba Acco En.
San Francisco permit records name Acco Engineered Systems Inc. Dba Acco En, Berland Design and Faragon Restoration Ltd as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Aug 29 – Apr 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 3 |
Commercial and multifamily, biggest first.
#202604038848 otc alterations permit permrevision 202603026778- remove failing eqipment and perform emergency repair work by replacing with (n) fillport equipment. Status: Issued |
| Acco Engineered Systems Inc. Dba Acco En |
| — |
| applied Mar 2 | #202603026778 otc alterations permit remove failing eqipment and perform emergency repair wokr by replacing with (n) fillport equipment. Status: Issued | Acco Engineered Systems Inc. Dba Acco En | $64K |
| applied Mar 4 | #202603046941 sign - erect replace damaged fascia panel at (e) awning Status: Complete | Berland Design | $100K |
| applied Sep 4 | #202509044595 otc alterations permit 2nd floor, 4th floor basement level, common stairwell : drywall repair, insulation, base trim, painting/wall paper. common hallways and stairwell. Status: Complete | Faragon Restoration Ltd | $44.8K |
| applied Aug 29 | #202508294256 otc alterations permit verify (e) sound levels in sleeping rooms per sffc 1103.7.6.1 Status: Complete | Everon Llc | — |
In San Francisco, biggest first.