Commercial General Building work permitted April 29, 2025, with 10 permits through June 26, 2026, declaring $980,897 of work. Contractor on record: Bevilacqua & Sons.
Get new commercial permits near 94111 or San Francisco, free weekly email
14/f-ste 1420: demolition of (e) flr and (e) partitions, (e) ceiling grid/tile to remain, (e) lighting to remain and some to be relocated. the new propsed design includes: offices, break area, open office area, one conference room and new finishes.
San Francisco permit records name Bevilacqua & Sons, Rudolph Commercial Interiors Inc, Rci and Osman Construction Inc as the contractors on this project, among 7 contractors in all.
10 permits issued Apr 29 – Jun 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 26 | #202606263975 |
Commercial and multifamily, biggest first.
otc alterations permit
14/fl- partial ti to include adding partition walls for 3 (n) offices and upgrade hvac system and electrical.
Status: Complete
| Rudolph Commercial Interiors Inc, Rci |
| $130K |
| applied Feb 20 | #202602206274 otc alterations permit existing cafe to be remodeled at ground floor. a new accessible toilet, all work is limited to inteiror of suite# 103 only. modify (e) partition walls. electrical and mechanical existing to remain unless noted. Status: Issued | Osman Construction Inc | $65K |
| applied Apr 9 | #202604099173 otc alterations permit installation of 4 phone booths at suite 800. seisimic anchoring, electrical and life safety to be included. Status: Complete | Bevilacqua & Sons | $30K |
| applied Mar 30 | #202603308508 otc alterations permit change of use to include ti of suite 107 to include replacement of flooring, wall, and ceiling finishes and installation of (n) and (e) furnishing fixtures, and equipment. a non bearing wall and per will be removed. some non outlets and switches will be added and (n) sink well be connected to (e) Status: Issued | Various Built Construction | $40K |
| applied Jul 16 | #202507090409 additions alterations or repairs provide a new 2 way emergency communication system. the base station will be installed on the 1st fl fire control room. new call stations will be installed at stair 1 and stair 2 on 2nd, 6th, 10th,14th, 18th, 22nd and 26th fl. Status: Complete | Sabah International Incorporated | $45.4K |
| applied Sep 9 | #202509094895 otc alterations permit 14th floor: fire alarm modification to existing system. add 10 new speaker strobes, add 11 new speakers,add 1 new control relay for vav damper control panel. ref pa# 202502109994 Status: Complete | Convergint Technologies Llc | $14K |
| applied Jul 28 | #202507281701 otc alterations permit fire sprinkler t.i., relocate 48 pendants due to removed ceiling on the 14th flr. ref t.i.#: 202502109994. suite 1420. Status: Complete | Golden Gate Fire Protection Inc | $12K |
| applied Feb 20 | #202502109994 additions alterations or repairs 14/f-ste 1420: demolition of (e) flr and (e) partitions, (e) ceiling grid/tile to remain, (e) lighting to remain and some to be relocated. the new propsed design includes: offices, break area, open office area, one conference room and new finishes. Status: Complete | Bevilacqua & Sons | $285K |
| applied Feb 10 | #202502100004 additions alterations or repairs 14/f-ste 1450: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new propsed design includes: offices, break area, open office area, one conference room and new ceiling. Status: Complete | Bevilacqua & Sons | $200K |
| applied Feb 10 | #202502100005 additions alterations or repairs 14/f-ste 1460: demolition of (e) flr finishes and (e) partitions and (e) ceiling. the new proposed design includes: offices, break area, open office area, one conference room and new ceiling. Status: Complete | Bevilacqua & Sons | $160K |