Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Francisco, CA
Multifamily General Building work permitted April 13, 2026, declaring $120,000 of work. Contractor on record: B B J Electric, Inc.
replace existing generator with uninterupted power system (ups). install ups in basement electrical room. run feeder to existing emergency panel at top of stairwell on roof level. disconnect existing generator and automatic transfer switch (ats).
San Francisco permit records name B B J Electric, Inc as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued Apr 13 – Apr 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 23 | #202505227091 additions alterations or repairs replace existing generator with uninterupted power system (ups). install ups in basement electrical room. run feeder to existing emergency panel at top of stairwell on roof level. disconnect existing generator and automatic transfer switch (ats). |
Commercial and multifamily, biggest first.
Status: Complete
| B B J Electric, Inc |
| $120K |
In San Francisco, biggest first.