Get ProEvery project in every city · from $79/mo
Get Promultifamily project · San Francisco, CA
Multifamily General Building work permitted November 20, 2024, with 5 permits through July 17, 2026, declaring $394,480 of work. Contractor on record: Cahill Guzman Construction Group Jv.
Get new commercial permits near 94107 or San Francisco, free weekly email
temporary excavation shoring system for proposed h-story residential bldg at 160 freelon st. the excavation with typical retained heights up to 5-feet are shored using cantilevered soldier piles and timber lagging. ref pa# 202209283327.
San Francisco permit records name Cahill Guzman Construction Group Jv, Martinelli Environmental Graph and Westates Mechanical Corporation Inc as the contractors on this project.
5 permits issued Nov 20 – Jul 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 16 |
Commercial and multifamily, biggest first.
#202607165156
otc alterations permit
evacuation maps. ref to building permit #202209283327
Status: Issued
| Martinelli Environmental Graph |
| $12.5K |
| applied Aug 27 | #202508143059 additions alterations or repairs construction of tower crane foundation for pa 202209283327. Status: Issued | Cahill Guzman Construction Group Jv | $100K |
| applied May 21 | #202505126261 additions alterations or repairs temporary excavation shoring system for proposed h-story residential bldg at 160 freelon st. the excavation with typical retained heights up to 5-feet are shored using cantilevered soldier piles and timber lagging. ref pa# 202209283327. Status: Complete | Cahill Guzman Construction Group Jv | $150K |
| applied Apr 3 | #202504033626 otc alterations permit indicator test pile permit. work includes - (10) x indicator test piles (ip-h); - (2) x compressor test piles; 3 reaction test piles. work for future building under pa#202209283327. Status: Complete | Cahill Guzman Construction Group Jv | $120K |
| applied Nov 20 | #202411205412 otc alterations permit installation of new 4" ug pipe from the street curb with 4" ibr into the fire pump room of the bldg. total linear distance from the st. curb to the stair up is approx 140. ref pa# 2022-09-28-3327. Status: Issued | Westates Mechanical Corporation Inc | $12K |
In San Francisco, biggest first.