Get Procommercial project · San Diego, CA
Commercial Electrical, Solar work permitted December 5, 2024, with 2 permits through March 26, 2025. Contractor on record: Estephany Arreola.
10.140 kW DC PV, 13.5 kWh ESS (26) CSI SOLAR CO. CS6R-390MS-HL (BLK) (1) TESLA POWERWALL 3 WITH 11.5KW INTEGRATED INVERTER (240V) (1) 60A AC DISCONNECT (1) FIRST ALERT HD6135FB (1) TESLA BACKUP SWITCH (1) ESS DISCONNECT SWITCH
San Diego permit records name Estephany Arreola and Shady Rezkalla as the contractors on this project.
2 permits issued Dec 5 – Mar 26, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 26 | #PMT-3345058 Photovoltaic - SB 379 10.140 kW DC PV, 13.5 kWh ESS (26) CSI SOLAR CO. CS6R-390MS-HL (BLK) (1) TESLA POWERWALL 3 WITH 11.5KW INTEGRATED INVERTER (240V) (1) 60A AC DISCONNECT (1) FIRST ALERT HD6135FB (1) TESLA BACKUP SWITCH (1) ESS DISCONNECT SWITCH |
In San Diego, biggest first.
Status: Closed
| Estephany Arreola |
| — |
| applied Dec 5 | #PMT-3326512 No-Plan - Nonresidential/Multifamily - Electrical Status: Closed | Shady Rezkalla | — |