Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical, Solar work permitted April 7, 2025, with 3 permits through December 22, 2025. Contractor on record: Estephany Arreola.
8.190 kW DC PV, 27.0 kWh ESS (21) CSI SOLAR CO. CS6R-390MS-HL (BLK) (1) TESLA POWERWALL 3 WITH 11.5KW INTEGRATED INVERTER (1) TESLA POWERWALL 3 EXPANSION UNIT (1) 60A AC DISCONNECT (1) 125A LOAD CENTER (1) ESS DISCONNECT SWITCH (1) TESLA BACKUP SWITCH
San Diego permit records name Estephany Arreola and Scott Hansen as the contractors on this project.
3 permits issued Apr 7 – Dec 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 20 | #PMT-3392761 No-Plan - Nonresidential/Multifamily - Electrical Status: Issued |
| — |
| applied Sep 24 | #PMT-3377167 Photovoltaic - SB 379 3.60 KW DC PV, (8) Solar Modules Status: Issued | Estephany Arreola | — |
| applied Apr 7 | #PMT-3346800 Photovoltaic - SB 379 8.190 kW DC PV, 27.0 kWh ESS (21) CSI SOLAR CO. CS6R-390MS-HL (BLK) (1) TESLA POWERWALL 3 WITH 11.5KW INTEGRATED INVERTER (1) TESLA POWERWALL 3 EXPANSION UNIT (1) 60A AC DISCONNECT (1) 125A LOAD CENTER (1) ESS DISCONNECT SWITCH (1) TESLA BACKUP SWITCH Status: Issued | Estephany Arreola | — |