Multifamily Electrical work permitted July 14, 2026. Contractor on record: Sunrun.
To install a 4.86 kW rooftop photovoltaic system with 7 modules and (1) Tesla Powerwall 3 battery energy storage system at the existing condo building.
San Diego permit records name Sunrun as the contractor on this project.
1 permit issued Jul 14 – Jul 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Nov 5 | #PMT-3384889 Electrical Pmt To install a 4.86 kW rooftop photovoltaic system with 7 modules and (1) Tesla Powerwall 3 battery energy storage system at the existing condo building. Status: Inspection Followup | Sunrun | — |
In San Diego, biggest first.
Source: building permit records from San Diego's daily open-data file, checked daily. Data through . How we count