Multifamily Electrical work permitted May 22, 2026. Contractor on record: Sunrun.
For a proposed installation of a roof-mounted 10.25 KW DC Photovoltaic System and Tesla Powerwall system for an existing condo, Unit 66.
San Diego permit records name Sunrun as the contractor on this project.
1 permit issued May 22 – May 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 4 | #PMT-3389773 Electrical Pmt For a proposed installation of a roof-mounted 10.25 KW DC Photovoltaic System and Tesla Powerwall system for an existing condo, Unit 66. Status: Issued | Sunrun | — |
In San Diego, biggest first.
Source: building permit records from San Diego's daily open-data file, checked daily. Data through . How we count