Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted June 10, 2025, with 11 permits through June 16, 2025. Contractor on record: Sean Eslinger.
Work associated with construction of a Screen Wall (Conc) adjacent to the Flow Equal. Basins, to expand the Primary Sedimentation Tanks; To expand the 1st Stage Bioreactors including new 'Aeration's Building' atop the Bioreactors; expand the 2nd Stage Bioreactor basins; expand the Tertiary Filters which includes a new conc building for Filters no. 7, meter vault, filter influent structure, & containment area; the Waste Backwash tank; upgrades to the Chlorine Contact Basins & the Effluent Pump Station; the Disinfection Feed Facility, Electrical. Process plumbing and Site upgrades throughout.
San Diego permit records name Sean Eslinger as the contractor on this project.
11 permits issued Jun 10 – Jun 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In San Diego, biggest first.
#PMT-3354937 Electrical Pmt Work associated with construction of a Screen Wall (Conc) adjacent to the Flow Equal. Basins, to expand the Primary Sedimentation Tanks; To expand the 1st Stage Bioreactors including new 'Aeration's Building' atop the Bioreactors; expand the 2nd Stage Bioreactor basins; expand the Tertiary Filters… Status: Inspection Followup |
| Sean Eslinger |
| — |
| applied May 21 | #PMT-3354917 Building Permit To construct a Screen Wall (Conc) adjacent to the Flow Equal. Basins, to expand the Primary Sedimentation Tanks; To expand the 1st Stage Bioreactors including new 'Aeration's Building' atop the Bioreactors; expand the 2nd Stage Bioreactor basins; expand the Tertiary Filters which includes a new… Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354936 Mechanical Pmt Work associated with construction of a Screen Wall (Conc) adjacent to the Flow Equal. Basins, to expand the Primary Sedimentation Tanks; To expand the 1st Stage Bioreactors including new 'Aeration's Building' atop the Bioreactors; expand the 2nd Stage Bioreactor basins; expand the Tertiary Filters… Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354938 Plumbing Pmt Work associated with construction of a Screen Wall (Conc) adjacent to the Flow Equal. Basins, to expand the Primary Sedimentation Tanks; To expand the 1st Stage Bioreactors including new 'Aeration's Building' atop the Bioreactors; expand the 2nd Stage Bioreactor basins; expand the Tertiary Filters… Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354905 Electrical Pmt Work associated with construction of two hazardous material storage areas. Work includes slabs on grade, canopies and retaining walls for a Urea Facility and Carbon Chemical Facility. Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354762 Plumbing Pmt Work associated with construction of four (4) secondary clarifiers, an electrical building, an influent distribution structure, retaining walls and a concrete protection slab over and existing storm drain. Status: Closed | Sean Eslinger | — |
| applied May 21 | #PMT-3354906 Plumbing Pmt Work associated with construction of two hazardous material storage areas. Work includes slabs on grade, canopies and retaining walls for a Urea Facility and Carbon Chemical Facility. Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354761 Electrical Pmt Work associated with construction of four (4) secondary clarifiers, an electrical building, an influent distribution structure, retaining walls and a concrete protection slab over and existing storm drain. Status: Inspection Followup | Sean Eslinger | — |
| applied May 21 | #PMT-3354893 Building Permit To construct two hazardous material storage areas. Work includes slabs on grade, canopies and retaining walls for a Urea Facility and Carbon Chemical Facility. Status: Issued | Sean Eslinger | — |
| applied May 21 | #PMT-3354759 Mechanical Pmt Work associated with construction of four (4) secondary clarifiers, an electrical building, an influent distribution structure, retaining walls and a concrete protection slab over and existing storm drain. Status: Closed | Sean Eslinger | — |
| applied May 21 | #PMT-3354753 Building Permit To construct four (4) secondary clarifiers, an electrical building, an influent distribution structure, retaining walls and a concrete protection slab over and existing storm drain. Status: Inspection Followup | Sean Eslinger | — |