Issued Jun 16 · 9 permits
$46.1M
*Executive Order Permit Now* For construction of new 6-story Factory-built Housing MDU. BC Code 1051.
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Jun 16 · 9 permits
$46.1M
*Executive Order Permit Now* For construction of new 6-story Factory-built Housing MDU. BC Code 1051.
Issued Jun 10 · 4 permits
$45.2M
A new mixed use building consisting of 125 extended stay rental units (hotel non-transient) and 57 multifamily apartment units on a vacant lot. BC Code 2132
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Jun 4 · 6 permits
$11M
Proposed tenant improvement to convert an existing hotel into an MDU. Work to include the repair and upgrade of existing building systems. BC Code:4380
Issued Jun 25 · 5 permits
$9.6M
For the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing…
Issued Jun 26 · 5 permits
$9.3M
MISSION BAY PARK: Building, Mechanical, Electrical & Plumbing permit. Comfort station replacement, Demolition of Existing Comfort station. Leaving underground sump pump room in…
Issued Jun 3 · 6 permits
$4.3M
For an interior tenant improvement at levels 3 & 4 of an existing 4-story commercial building. Work to include selective demolition of existing partitions, doors, ceilings and…
Issued Jun 3 · 6 permits
$4M
demolition as required for new work. Interior work includes office & lab improvements on the 4th level and associated improvements and modifications to structural, mechanical,…
Issued Jun 27 · 43 permits
$2.8M
Associated work with building permit Phase 4 Bldg. 6 (12811 Encantadora) Units: 28-33 Type B
Issued Jun 10 · 6 permits
$2.7M
For interior tenant improvements to the third floor of an (E) (3)-story commercial office building. Work to include (N) nonstructural partitions, doors, ceiling grid, finishes,…
Issued Jun 10 · 6 permits
$2.5M
For interior tenant improvements to all (3) floors of an (E) (3)-story commercial building. Work to include non-load bearing interior partitions, (N) interior doors, fixtures,…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026