Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted June 20, 2025, with 5 permits through June 25, 2025, declaring $9,589,922 of work. Contractor on record: Bellingham Marine Industries.
For the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing Marina.
San Diego permit records name Bellingham Marine Industries as the contractor on this project.
5 permits issued Jun 20 – Jun 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 1 |
In San Diego, biggest first.
#PMT-3299780
Mechanical Pmt
Mechanical work associated with the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing Marina.
Status: Inspection Followup
| Bellingham Marine Industries |
| — |
| applied Jul 1 | #PMT-3299781 Plumbing Pmt Plumbing work associated with the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing Marina. Status: Inspection Followup | Bellingham Marine Industries | — |
| applied Mar 25 | #PMT-3344888 Approval - Construction - Fire Pmt - Suppression Standpipe system. (24) standpipe fire hose connections. FDCs under PRJ-1117051. Status: Inspection Followup | Not published | — |
| applied Jul 1 | #PMT-3299779 Electrical Pmt Electrical work associated with the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing Marina. Status: Inspection Followup | Bellingham Marine Industries | — |
| applied Jul 1 | #PMT-3299777 Building Permit For the installation of a new Marina floating docks, guide piles, gangways and Marina utility systems for electrical, domestic water, sewer and fire protection to an existing Marina. Status: Inspection Followup | Bellingham Marine Industries | $9.6M |