Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted June 17, 2025, with 6 permits through October 22, 2025, declaring $746,720 of work. Contractor on record: Swinerton.
Propose tenant improvement of a speculative suite (3,365 SF office/3,815 SF of new lab space), A 575 SF conference room, alteration to the existing training room, and install storage cages at shipping and receiving. HVAC, plumbing, and electrical scope as needed. Hazardous materials are limited to the amounts specified in the CBC table 307.1(1) and 307.1(2) per control area. A separate tenant improvement permit will be required to be submitted for review if a tenant chooses to exceed the allowable amounts of if a system requiring a tank application (TA) permit is proposed. (SEE IB-116) for…
San Diego permit records name Swinerton, Hiller and Ashley Hochstadt as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Jun 17 – Oct 22, newest first.
In San Diego, biggest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 16 | #PMT-3364214 Approval - Construction - Fire Pmt - Suppression Deferred Fire Sprinklers with Plans. PRJ-1134635 Status: Closed | Hiller | — |
| applied Jul 29 | #PMT-3366570 Approval - Construction - Fire Pmt - Alarm Deferred Fire Alarm with Plans. PRJ-1134635 Status: Closed | Ashley Hochstadt | — |
| applied Apr 18 | #PMT-3349100 Building Permit Propose tenant improvement of a speculative suite (3,365 SF office/3,815 SF of new lab space), A 575 SF conference room, alteration to the existing training room, and install storage cages at shipping and receiving. HVAC, plumbing, and electrical scope as needed. Hazardous materials are limited to… Status: Closed | Swinerton | $747K |
| applied Apr 18 | #PMT-3349104 Electrical Pmt Electrical work associated with propose tenant improvement of a speculative suite (3,365 SF office/3,815 SF of new lab space), A 575 SF conference room, alteration to the existing training room, and install storage cages at shipping and receiving. HVAC, plumbing, and electrical scope as needed.… Status: Closed | Swinerton | — |
| applied Apr 18 | #PMT-3349103 Mechanical Pmt Mechanical work associated with propose tenant improvement of a speculative suite (3,365 SF office/3,815 SF of new lab space), A 575 SF conference room, alteration to the existing training room, and install storage cages at shipping and receiving. HVAC, plumbing, and electrical scope as needed.… Status: Closed | Swinerton | — |
| applied Apr 18 | #PMT-3349105 Plumbing Pmt plumbing work associated with propose tenant improvement of a speculative suite (3,365 SF office/3,815 SF of new lab space), A 575 SF conference room, alteration to the existing training room, and install storage cages at shipping and receiving. HVAC, plumbing, and electrical scope as needed.… Status: Closed | Swinerton | — |