Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted July 10, 2026, with 5 permits through July 10, 2026, declaring $1,840,800 of work. Contractor on record: Turner-Flatiron, A Joint Venture.
Building permit for tenant improvement for Delta Airlines at the SD International airport.
San Diego permit records name Turner-Flatiron, A Joint Venture as the contractor on this project.
5 permits issued Jul 10 – Jul 10, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 21 | #PMT-3392780 Mechanical Pmt |
In San Diego, biggest first.
Mechanical permit Provide new variable air valve (vav) boxes, and associated ductwork, duct supports, balancing dampers, and diffusers, registers, and grilles. Vav's shall tap off of mechanical supply duct main or utilize stubouts from existing AHU's from the base building core and shell project.…
Status: Issued
| Turner-Flatiron, A Joint Venture |
| — |
| applied Dec 21 | #PMT-3392779 Electrical Pmt Electrical permit associated with the building permit for tenant improvement for Delta Airlines within the T1 at the SDIA.Power distribution, power devices, lighting, lighting controls for airline operations Tenant spaces shall be provided with dedicated panel(s) local to tenant spaces. Tenant… Status: Inspection Followup | Turner-Flatiron, A Joint Venture | — |
| applied Dec 21 | #PMT-3392781 Plumbing Pmt Pluming permit associated with the building permit for tenant improvements for Delta airline at the SDIA to provide plumbing utilities for new restrooms. Status: Inspection Followup | Turner-Flatiron, A Joint Venture | — |
| applied Dec 21 | #PMT-3392778 Building Permit Building permit for tenant improvement for Delta Airlines at the SD International airport. Status: Inspection Followup | Turner-Flatiron, A Joint Venture | $1.8M |
| applied Dec 21 | #PMT-3392782 Approval - Construction - Fire Pmt - Suppression Sprinkler system tenant improvement. A preaction system is not being installed as specified in the scope of work. The scope of work was not modified to exclude the preaction system from the scope of work for the final version of the plans. Status: Issued | Turner-Flatiron, A Joint Venture | — |