Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted March 18, 2026, with 4 permits through March 18, 2026, declaring $41,600 of work. Contractor on record: Turner-Flatiron, A Joint Venture.
Building permit for Tenant Improvements within the existing shell space in Terminal 1 to the Southwest Airlines within Phase 1B
San Diego permit records name Turner-Flatiron, A Joint Venture as the contractor on this project.
4 permits issued Mar 18 – Mar 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 23 | #PMT-3393268 Building Permit Building permit for Tenant Improvements within the existing shell space in Terminal 1 to the Southwest Airlines within Phase 1B |
In San Diego, biggest first.
Status: Issued
| Turner-Flatiron, A Joint Venture |
| $41.6K |
| applied Dec 29 | #PMT-3393587 Mechanical Pmt Mechanical Permit associated with building permit. Provide new variable air valve boxes and associated duct work, duct supports, balance dampers and diffusers, registers, and grilles. VAV's shall tap off of mechanical supply duct main or utilize stub outs from existing AHU's Status: Issued | Turner-Flatiron, A Joint Venture | — |
| applied Dec 29 | #PMT-3393588 Approval - Construction - Fire Pmt - Suppression Sprinkler system tenant improvement plans. Backflow preventer model, flexible hose connection configuration, and hanger support systems approved per overhead system plans under separate submittal. Status: Issued | Turner-Flatiron, A Joint Venture | — |
| applied Dec 29 | #PMT-3393586 Electrical Pmt Electrical permit associated with the building permit for power distribution, power devices, lighting fixtures and lighting control for Southwest Airlines. Status: Issued | Turner-Flatiron, A Joint Venture | — |