Multifamily Electrical work permitted May 1, 2025. Contractor on record: Sunrun.
For the proposed installed of (1) additional Tesla Powerwall 3, energy storage system to existing solar system installed at the building condo. Work to include tying this equipment to the multiple existing sources it will be fed by.
San Diego permit records name Sunrun as the contractor on this project.
1 permit issued May 1 – May 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 24 | #PMT-3334086 Electrical Pmt For the proposed installed of (1) additional Tesla Powerwall 3, energy storage system to existing solar system installed at the building condo. Work to include tying this equipment to the multiple existing sources it will be fed by. Status: Closed | Sunrun |