Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical work permitted March 21, 2025, with 3 permits through August 25, 2025. Contractor on record: Aldridge Electric.
Installation of (1) 175A 208V 3 phase circuit from panel to new UPS bypass switch. Circuit extended from bypass switch to new UPS battery back up equipment and on to existing distribution panel.
San Diego permit records name Aldridge Electric as the contractor on this project.
3 permits issued Mar 21 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 21 | #PMT-3370966 No-Plan - Nonresidential/Multifamily - Electrical Installation of (1) 175A 208V 3 phase circuit from panel to new UPS bypass switch. Circuit extended from bypass switch to new UPS battery back up equipment and on to existing distribution panel. Status: Closed | Aldridge Electric |
| — |
| applied Mar 20 | #PMT-3344027 No-Plan - Nonresidential/Multifamily - Electrical Installation of (1) 200A 480V 3phase circuit on an existing spare 200A circuit breaker to a new 150kva transformer for a new 400A 3phase 208V panel with (1) 200A and (2) 100A breakers feeding respective sub panels. Status: Closed | Aldridge Electric | — |
| applied Mar 20 | #PMT-3344022 No-Plan - Nonresidential/Multifamily - Electrical Installation of a new 75kva transformer on an existing 80A 3phase 480V circuit for a new 150A 3phase 208V panel. Status: Closed | Aldridge Electric | — |