Commercial Electrical work permitted March 20, 2025. Contractor on record: New Wave Electric - Henry Kane.
DURING A PRE-SCHEDULED SDGE UTILITY OUTAGE ON MONDAY 24MAR25 WHICH THE LANDLORD HAS COORDINATED WITH THEM, WE WILL INSTALL NEW CABLING FROM THE EXISTING FACTORY-INSTALLED BUSS-MOUNTED LUGS TO THE EXISTING METER SOCKETS , TO ALLOW FOR SDGE'S NEW METER INSTALLATIONS. ON THE PREVIOUS TI PERMIT #3281130 WE WERE ISSUED METER RELEASES FOR THE 3x SOCKETS. BUT THERE IS NO MAIN BREAKER, AND SDGE REQUIRED A SHUTDOWN PERIOD TO CABLE FROM LUGS TO SOCKETS, AND A DISCONNECT-RECONNECT CITY INSPECTION BEFORE THEY WILL RESTORE POWER.
San Diego permit records name New Wave Electric - Henry Kane as the contractor on this project.
1 permit issued Mar 20 – Mar 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 20 | #PMT-3344177 No-Plan - Nonresidential/Multifamily - Electrical DURING A PRE-SCHEDULED SDGE UTILITY OUTAGE ON MONDAY 24MAR25 WHICH THE LANDLORD HAS COORDINATED WITH THEM, WE WILL INSTALL NEW CABLING FROM THE EXISTING FACTORY-INSTALLED BUSS-MOUNTED LUGS TO THE EXISTING METER SOCKETS , TO ALLOW FOR SDGE'S NEW METER INSTALLATIONS. ON THE PREVIOUS TI PERMIT… |
Status: Closed