Multifamily Electrical, Mep work permitted March 6, 2025, with 2 permits through August 7, 2026. Contractor on record: Taylor Shirk.
Trade permits for the utilities supporting the following backyard improvements: prefab above-ground pool (pump circuit, electrical), prefab outdoor kitchen (gas, electrical, water supply, and sanitary sewer connections), prefab fire pit (gas line), flush-mount floor outlets (electrical), and water feature (irrigation tie-in). Permitting revolves around the gas, electrical, and plumbing utilities for these features
San Diego permit records name Taylor Shirk and Cornerstone Communities Corp as the contractors on this project.
2 permits issued Mar 6 – Aug 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 7 | #PMT-3432078 |
No-Plan - Residential - Combination Mech/Elec/Plum
Trade permits for the utilities supporting the following backyard improvements: prefab above-ground pool (pump circuit, electrical), prefab outdoor kitchen (gas, electrical, water supply, and sanitary sewer connections), prefab fire pit (gas line), flush-mount floor outlets (electrical), and water…
Status: Issued
| Taylor Shirk |
| — |
| applied Mar 5 | #PMT-3341393 No-Plan - Nonresidential/Multifamily - Electrical Install irrigation meter pedestal for condo project. Status: Closed | Cornerstone Communities Corp | — |