Commercial General Building, Demolition, Elevator, Fire Protection, Hvac/Mechanical work permitted December 16, 2024, with 5 permits through April 2, 2026. Contractor on record: B M Consulting Services Inc.
FOR INSTALLATION OF A PATTERSON PUMP TO AN EXISTING NFPA 13 FIRE-SUPPRESSION SYSTEM PER APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 20.
Philadelphia permit records name B M Consulting Services Inc, Dylan Sloan and KMC Partners LLC as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Dec 16 – Apr 2, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#FP-2026-000508 Fire Suppression Permit · Addition and/or Alterations FOR INSTALLATION OF A PATTERSON PUMP TO AN EXISTING NFPA 13 FIRE-SUPPRESSION SYSTEM PER APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 20. Status: Issued | B M Consulting Services Inc | — | |
#MP-2025-004472 Mechanical / Fuel Gas Permit · Addition and/or Alterations For installation of gas piping to equipment as per approved plans. Status: Completed | Dylan Sloan | — | |
#CP-2025-000948 Commercial Building Permit · Addition and/or Alteration LEVEL III ALTERATIONS TO INCLUDE INTERIOR AND REAR ADDITIONS AND COMPLETE CHANGE OF OCCUPANCY TO CREATE AN ASSEMBLY & ENTERTAINMENT USE WITHIN AN EXISTING FIVE (5) STORY BUILDING AS PER APPROVED PLANS AND BBS VARIANCE NO. MI-2024-003475. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE… Status: Completed | KMC Partners LLC | — | |
#SP-2025-000606 Site / Utility Permit · Excavation EXCAVATION WORK ASSOCIATED WITH CONSTRUCTION OF NEW ELEVATOR PIT AS PER APPROVED PLANS. *2018 IEBC REVIEW* Status: Completed | Mayfield Site Contractors Inc | — | |
#GM-2024-010820 General Permit Minor · EZ Interior Non-Load-Bearing Wall Demo. EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans. Status: Completed | Not published | — |