Commercial Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted January 30, 2025, with 28 permits through March 3, 2026. Contractor on record: Charles G. Hunter III.
EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install FS #1 Tank FS (4.0/4.0/4.0/4.0 gallon) - Fire Cabinet Right - [covering 4 hoods]
Philadelphia permit records name Charles G. Hunter III, Hatzel & Buehler Inc and Joseph F Spaeder as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
28 permits issued Jan 30 – Mar 3, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#FP-2026-000387 Fire Suppression Permit · Addition and/or Alterations EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. Install FS #1 Tank FS (4.0/4.0/4.0/4.0 gallon) - Fire Cabinet Right - [covering 4 hoods] Status: Completed | Joseph F Spaeder | — | |
#EP-2025-012154 Electrical Permit · New Construction Av system installation Status: Completed | J.W. Carrigan | — | |
#FP-2025-002102 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 32 existing sprinkler heads for new layout on the lower level. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-002100 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 170 sprinkler heads to accommodate new layout on the 1st floor. Status: Completed | Charles G. Hunter III | — | |
#EP-2025-008789 Electrical Permit · Addition and/or Alteration INSTALL CLEAN AGENT SPO SYSTEM AND ONE PRE ACTION SYSTEM. CONNECT BOTH SYSTEMS TO THE FIRE ALARM SYSTEM. ALL WORK TO BE DONE ACCORDING TO THE 2017 NEC, 2016 NFPA 72 AND PER PLANS. Status: Completed | Current Electrical Solutions, Inc. | — | |
#FP-2025-001839 Fire Suppression Permit · Addition and/or Alterations Installing an automatic clean agent fire suppression system in the 2nd floor storage room per NFPA 2001 as per approved plans. Status: Completed | Suppression Systems Inc | — | |
#FP-2025-001799 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 158 sprinkler heads to accommodate new layout on the second floor Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001586 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 191 sprinklers to accommodate new layout on the 8th floor. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001587 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 142 sprinklers to accommodate new layout on the 9th floor. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001584 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 169 sprinklers on the 17th floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001585 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 205 sprinklers to accommodate new layout on the 18th floor. Status: Completed | Charles G. Hunter III | — | |
#EP-2025-005470 Electrical Permit · Addition and/or Alteration Furnish and install Siemens fire alarm as per sealed drawings. Submittals Included.ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72. Status: Completed | Hatzel & Buehler Inc | — | |
#EP-2025-006439 Electrical Permit · Addition and/or Alteration Furnish and install 9516 Category 6A plenum cables. F&I all required patch cords F&I fiber optic back bone to all IDFs as per drawings F&I all racks and wire management as per drawings Support all new cabling to comply with local codes Terminate, Test and Label all new cabling Status: Completed | Bluestone Communications Inc | — | |
#FP-2025-001317 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinklers on the 15th floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001318 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinklers on the 16th floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001142 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinkler heads on the 14th Floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-001141 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinkler heads on the 13th Floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000948 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinklers on the 11th floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000946 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 223 sprinklers on the 7th Floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000947 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinklers on the 10th Floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000949 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 208 sprinklers on the 12th floor to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000630 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 223 sprinklers on the 6th floor, to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000629 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 223 sprinklers on the 5th floor, to accommodate new layout. Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000558 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 223 sprinklers to accommodate new layout Status: Completed | Charles G. Hunter III | — | |
#FP-2025-000454 Fire Suppression Permit · Addition and/or Alterations EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the relocation of sprinkler heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 225 existing sprinkler heads to accommodate new layout Status: Completed | Charles G. Hunter III | — | |
#PP-2025-001712 Plumbing Permit · Alterations INTERIOR SHELL/FIT OUT OF NEW CONSTRUCTION OFFICE BUILDING WITH AMENITY SPACES. INSTALLATION OF DRAINAGE, WASTE, VENT, AND WATER SUPPLY FOR 165 FIXTURES FROM ROUGH TO FINISH. ALL WORK PERFORMED IN COMPLIANCE WITH 2018 PPC AND APPROVED PLANS. Status: Completed | E. J. Raith Mechanical Inc. | — | |
#EP-2025-000753 Electrical Permit · New Construction Furnish and install power for new equipment as per plans. Furnish and install cabling for lighting and controls as per plans. Install cabling for distribution system per drawings as per 2017 NEC. Status: Completed | Hatzel & Buehler Inc | — | |
#MP-2024-005734 Mechanical / Fuel Gas Permit · Addition and/or Alterations Mechanical / Fuel Gas Permit for combo CP-2024-005398 Status: Completed | Turner Construction Co | — |