commercial project · New York City, NY
817 Broadway Manhattan, New York City, NY 10003
Commercial work permitted March 17, 2025. Contractor on record: Structual Presv System.
Get a free email when a new permit is filed here
- n/a
- Project value
- 1
- Permit
- Mar 17
- First permit
- 3 days
- Application to issuemedian
What's being built
commercialOther
Facade Inspection. Designated Primary Site supervisor: Jesus Decola
Who is building at 817 Broadway Manhattan?
New York City permit records name Structual Presv System as the contractor on this project.
On file for this address
- A contractor phone number
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 817 Broadway Manhattan
1 permit, issued Mar 17.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 14 | #M01192935-I1-SC Suspended Scaffold · Initial Permit Facade Inspection. Designated Primary Site supervisor: Jesus Decola Status: Signed-Off | Structual Presv System | — |
Other projects in 10003
Commercial and multifamily, biggest first.
- 726 Broadway ManhattanMechanical modifications as per planscommercialBuilding, Fire protection, HVAC / Mechanical· Gilbane Building Company$17.7MOct 7
- 313 East 17 Street ManhattanPROPOSED CONVERSION ON A TWELVE (12) STORY COMUNITY FACILITY BUILDING TO A THISTEEN (13) STORY MIXED-USE RESIDENTIAL BUILDING. LOTS 11 AND 15 TO BE MERGED AS A SINGLE ZONING LOT.…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Prime Piping & Heating In$12.9MNov 6
- 67 Irving Place ManhattanConversion of Existing 12 story Office Building to Residential and Commercial Mixed UsecommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Cavan Builders Corp$10.8MNov 12
- 220 East 9 Street ManhattanConversion of existing parking garage to residential use per Article I Chapter 5 and vertical enlargement of buildingcommercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Platinum Services NY LLC$10MJun 30
- 115 5 Avenue ManhattanINSTALLATION OF NON-LOAD BEARING WALLS, FLOORS, CEILING & FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing$7.9MOct 28
- 111 5 Avenue ManhattanINSTALLATION OF NON-LOAD BEARING WALLS, FLOORS, CEILING AND FINISHES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing$7.3MOct 28
More projects by Structual Presv System
In New York City, biggest first.
- 23 East 39 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 8
- 11 East 1 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 1921 Cortelyou Road BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 131 Moore Street BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 6
- 200 5 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 6
- 450 6 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 30