multifamily project · New York City, NY
470 West 24 Street Manhattan, New York City, NY 10011
Multifamily General Building, Plumbing work permitted January 30, 2025, with 2 permits through January 30, 2025, declaring $246,000 of work. Contractor on record: CC Controlled PLBG Co.,In.
Get a free email when a new permit is filed here
- $246K
- Project value
- 2
- Permits
- Jan 30
- First permit
- 14 days
- Application to issuemedian
What's being built
INSTALL (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS AND (2) NEW STORAGE TANKS. RECONNECT EXISTING HIGH PRESSURE GAS WITH NEW REGULATOR AND GAS METER FOR HOT WATER HEATERS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Who is building at 470 West 24 Street Manhattan?
New York City permit records name CC Controlled PLBG Co.,In and C C Controlled Combustion as the contractors on this project.
On file for this address
- A contractor phone number
- The property owner
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 470 West 24 Street Manhattan
2 permits issued Jan 30 – Jan 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 16 | #M01160556-I1-PL Plumbing · Initial Permit INSTALL (2) NEW GAS FIRED HOT WATER HEATERS WITH INTEGRAL BURNERS AND (2) NEW STORAGE TANKS. RECONNECT EXISTING HIGH PRESSURE GAS WITH NEW REGULATOR AND GAS METER FOR HOT WATER HEATERS. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. Status: Signed-Off | CC Controlled PLBG Co.,In | $230K |
| applied Jan 16 | #M01160556-S1-GC General Construction · Initial Permit NEW BREACHING CONNECTING TO EXISTING 10 GAGE METAL LINER. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY. Status: Permit Issued | C C Controlled Combustion | $16K |
Other projects in 10011
Commercial and multifamily, biggest first.
- 408 West 15 Street ManhattanGENERAL CONSTRUCTION ON THE CELLAR, 1ST TO 4TH FLOOR AND ROOF AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$22.4MApr 17
- 122 5 Avenue ManhattanInterior partial demo and reconstruction of existing floor slabs on the 3rd - 5th floors. Demo of existing partitions and doors. Proposed stair and enclosure to be filed under…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JT Magen & Company Inc$19.2MOct 16
- 550 West 20 Street ManhattanFILING HEREWITH FOUNDATION WORK FOR BUILDING CONSTRUCTION AS PER PLANS.commercialBuilding$13.1MNov 5
- 418 West 21 Street ManhattanSEABURY HALL - REMOVAL AND INSTALLATION OF MECHANICAL DUCTWORK AND EQUIPMENT.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Consigli Construction Co$12.9MMay 7
- 134 West 18 Street ManhattanINTERIOR AND EXTERIOR RENOVATIONS ON FLOORS 01-03, FAC & ROF FOR NEW THEATRICAL STUDIO & OFFICES. HORIZONTAL EXTENSION AT 1ST FLOOR. VERTICAL EXTENSION AT 3RD FLOOR.commercialBuilding, Elevator, HVAC / Mechanical, Plumbing· Yorke Construction Corp$9.1MJan 9
- 111 8 Avenue ManhattanINSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Nucor Construction Corp$7.5MSep 14
More projects by CC Controlled PLBG Co.,In
In New York City, biggest first.
- 109 East 56 Street ManhattanREPLACEMENT (2) NEW LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.commercialBuilding, HVAC / Mechanical, Plumbing· C C Controlled Combustion$1.4MSep 2
- 26 West 61 Street ManhattanREMOVE (2) LOW PRESSURE STEAM BOILERS & REPLACE WITH (2) NEW LOW PRESSURE HOT WATER BOILERS. REPLACE (2) NEW COMBINATION #2 OIL/NAT GAS BURNERS. REPLACE ASSOCIATED PUMPS AND…multifamilyBuilding, HVAC / Mechanical, Plumbing· C C Controlled Combustion$1.3MSep 1
- 336 West End Avenue ManhattanGENERAL CONSTRUCTION FOR THE INSTALLATION OF NEW HEATING PLANT EQUIPMENT AND CHIMNEY LINER. NO CHANGE IN EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· C C Controlled Combustion$1.1MJun 20
- 250 West 89 Street ManhattanREPLACEMENT (2) NEW LOW PRESSURE BOILERS. REPLACEMENT (2) NEW COMBINATION GAS/OIL BURNERS. CHANGE GRADE OF FUEL OIL FROM #4 TO #2 OIL. NO CHANGE IN MEANS OF EGRESS USE GROUP OR…multifamilyBuilding, HVAC / Mechanical, Plumbing· C C Controlled Combustion$927KNov 17
- 60 East 96 Street ManhattanGENERAL CONSTRUCTION FOR THE INSTALLATION OF NEW HEATING PLANT EQUIPMENT AND CHIMNEY LINER. NO CHANGE IN EGRESS OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· C C Controlled Combustion$922KSep 23
- 401 West 23 Street ManhattanREMOVE AND REPLACE EXISTING (2) BOILERS AND ASSOCIATED BURNERS. EXISTING FLUE BREECHING TO BE UTILIZED. NO CHANGE IN EGRESS, OCCUPANCY, OR USE.multifamilyHVAC / Mechanical, Plumbing· C C Controlled Combustion$825KJul 30