Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, and seawall for wave dissipation. No change to use, egress or occupancy.
This is a new project: its first permit was issued October 22, 2026. The contractor on it is included with Pro and is named here 30 days after the first permit.
See the contractor1 permit issued Oct 22 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Dec 15 | #M01249540-S1-GC-CX Foundation · Initial Permit |
Commercial and multifamily, biggest first.
Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, and seawall for wave dissipation. No change to use, egress or occupancy.
Status: Permit Issued
| Contractor with Pro |
| $34.8M |