multifamily project · New York City, NY
2391 2 Avenue Manhattan, New York City, NY 10035
Multifamily work permitted March 11, 2025. Contractor on record: Structual Presv System.
Get a free email when a new permit is filed here
- n/a
- Project value
- 1
- Permit
- Mar 11
- First permit
- 6 days
- Application to issuemedian
What's being built
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Who is building at 2391 2 Avenue Manhattan?
New York City permit records name Structual Presv System as the contractor on this project.
On file for this address
- A contractor phone number
- The property owner
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 2391 2 Avenue Manhattan
1 permit, issued Mar 11.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 5 | #M01189358-I1-SC Suspended Scaffold · Initial Permit FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola Status: Permit Issued | Structual Presv System | — |
Other projects in 10035
Commercial and multifamily, biggest first.
- 319 East 117 Street ManhattanRemoval of existing oil fired steam heating plant, heating and ventilation units, provide new split systems, heat pumps electric convector heaterscommercialBuilding, HVAC / Mechanical, Plumbing· Litehouse Builders Inc$81MMar 12
- 110 East 129 Street ManhattanINTERIOR RENOVATION OF 9-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: RENOVATION OF INTERIOR UNITS AND CORRIDORS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· River City Builders LLC$25.1MSep 22
- 2005 Madison Avenue ManhattanInstallation of modular air cooled heat pump chillers & electric hot water boiler system. Installation of split system air-cooled heat pump systems and refrigerant systems.…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Tomco Mechanical Corp$16.8MMay 13
- 1980 Lexington Avenue ManhattanINTERIOR AND EXTERIOR RENOVATION OF 11-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: RENOVATION OF INTERIOR UNITS AND CORRIDORS; NO CHANGES TO USE, EGRESS,…multifamilyBuilding, Plumbing· River City Builders LLC$14.2MSep 29
- 1940 Lexington Avenue ManhattanINTERIOR RENOVATION OF 12-STORY NYCHA MULTIPLE DWELLING AS PART OF THE NYCHA PACT RENOVATION: RENOVATION OF INTERIOR UNITS AND CORRIDORS; NO CHANGES TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· River City Builders LLC$12.7MOct 22
- 2253 Third Avenue ManhattanApplication filed for interior apartment renovations; lobby renovation; roof repairs; as per drawings filed herewith.multifamilyBuilding· Structural Preserv System$12MSep 26
More projects by Structual Presv System
In New York City, biggest first.
- 23 East 39 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 8
- 11 East 1 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 1921 Cortelyou Road BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 131 Moore Street BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 6
- 200 5 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 6
- 450 6 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 30