commercial project · New York City, NY
205 Hudson Street Manhattan, New York City, NY 10013
Commercial work permitted March 28, 2025. Contractor on record: Structual Presv System.
Get a free email when a new permit is filed here
- n/a
- Project value
- 1
- Permit
- Mar 28
- First permit
- 2 days
- Application to issuemedian
What's being built
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
Who is building at 205 Hudson Street Manhattan?
New York City permit records name Structual Presv System as the contractor on this project.
On file for this address
- A contractor phone number
- The property owner
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 205 Hudson Street Manhattan
1 permit, issued Mar 28.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 26 | #M01196745-I1-SC Suspended Scaffold · Initial Permit FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola Status: Signed-Off | Structual Presv System | — |
Other projects in 10013
Commercial and multifamily, biggest first.
- 417 Canal Street ManhattanRemoval of sidewalk, curbs, asphalt pavement, utilities and site preparation. Excavation and installation of sewers and utilities and curbing, sidewalk, and asphalt pavement.commercialPlumbing· Gramercy Group, Inc$22.7MApr 14
- 200 Lafayette Street ManhattanConstruction modifications taking place on the 3-4th & 6-7th floors as indicated on the drawings.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· JT Magen & Company Inc$12.9MApr 2
- 148 Lafayette Street ManhattanFiling herewith architectural plans to include interior renovation and general construction on floors 10 thru 13. There will be no change of use, occupancy or egress under this…commercialBuilding, HVAC / Mechanical, Plumbing· Structure Tone, LLC$8MAug 25
- 370 Canal Street ManhattanExisting guestrooms interior renovation including fixtures and related finishes as per plans (Guest Rooms). There will be no change in use, egress, or occupancy.commercialBuilding· Continental Contractors I$5.9MJan 27
- 417 Canal Street ManhattanFiling to install six (6) below grade reinforced cast-place and precast structures. Scope includes excavation and backfill, placing steel reinforcement, placing and curing…commercialBuilding· Gramercy Group, Inc$5.3MMar 19
- 56 North Moore Street ManhattanFacade Renovations as shown on plans filed herewith.commercialBuilding· Leeding Builders Group LL$4.6MMay 27
More projects by Structual Presv System
In New York City, biggest first.
- 23 East 39 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 8
- 11 East 1 Street ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 1921 Cortelyou Road BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 7
- 131 Moore Street BrooklynFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Oct 6
- 200 5 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Oct 6
- 450 6 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Sep 30