Get ProEvery project in every city · from $79/mo
Get Procommercial project · New York City, NY
Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted December 23, 2024, with 7 permits through January 27, 2025, declaring $2,626,688 of work. Contractor on record: Richter & Ratner Contract.
Get new commercial permits near 10128 or New York City, free weekly email
PHASE 3.3S: Partial int. fitout @1fl (N) & Basement, including dismanting/installation of non-load bearing walls, ceilings, floors and finishes. Minor work @ cel (N) and SC (N). Exterior work at 1fl west elevation including remove of existing marquee
New York City permit records name Richter & Ratner Contract, Capitol Fire Sprinkler Co and Universal Plumbing Inc as the contractors on this project.
The property owner is included with Pro.
7 permits issued Dec 23 – Jan 27, newest first.
| Issued | Permit |
|---|
Commercial and multifamily, biggest first.
| Contractor |
|---|
| Value |
|---|
| applied Jan 13 | #M01080724-S5-FO Foundation · Initial Permit SPREAD FOOTINGS AND NEW S.O.G. FOR STAIR POSTS. Status: Signed-Off | Richter & Ratner Contract | $10K |
| applied Aug 27 | #M01080724-S1-ST Structural · Initial Permit PHASE 3.3 North Tower: Minor alterations including new slab openings and infills and new openings in non-structural exterior walls @ North Tower. Status: Signed-Off | Richter & Ratner Contract | $524K |
| applied Oct 9 | #M01080724-S3-PL Plumbing · Initial Permit PHASE 3.3N: MODIFY EXISTING SANITARY, VENT, DOMESTIC WATER AND STORM DISTRIBUTION IN CONJUNCTION WITH BUILDING ALTERATION. Status: Signed-Off | Universal Plumbing Inc | $132K |
| applied Sep 24 | #M01080724-S4-EW-SD Standpipe · Initial Permit PHASE 3.3N: MODIFICATION TO SPRINKLER SYSTEM AND STANDPIPE WORK IN CONJUNCTION WITH BUILDING ALTERATION. Status: Signed-Off | Capitol Fire Sprinkler Co | $87.7K |
| applied Sep 24 | #M01080724-S4-EW-SP Standpipe · Initial Permit PHASE 3.3N: MODIFICATION TO SPRINKLER SYSTEM AND STANDPIPE WORK IN CONJUNCTION WITH BUILDING ALTERATION. Status: Signed-Off | Capitol Fire Sprinkler Co | $87.7K |
| applied Sep 10 | #M01080724-I1-GC General Construction · Initial Permit PHASE 3.3S: Partial int. fitout @1fl (N) & Basement, including dismanting/installation of non-load bearing walls, ceilings, floors and finishes. Minor work @ cel (N) and SC (N). Exterior work at 1fl west elevation including remove of existing marquee Status: Signed-Off | Richter & Ratner Contract | $1M |
| applied Sep 11 | #M01080724-S2-MS Mechanical Systems · Initial Permit PHASE 3.3 N : Cut/cap existing duct main serving N Bas area. New multi-zone dedicated outdoor air unit w/chilled & hw coils along w/new VAVS & ductwork. DOAS-NC-1 will provide ventilation air to portions of N Bas & N1, Local 4 pipe fan coil units. Status: Signed-Off | Richter & Ratner Contract | $825K |
In New York City, biggest first.