Commercial General Building, Electrical, Hvac/Mechanical work permitted December 17, 2024, with 7 permits through May 18, 2026, declaring $3,872,299 of work. Contractor on record: Paul Joseph Thibodaux.
Get new commercial permits in New Orleans, free weekly email
Install (2) 600kw Generators w/ fuel oil tank & provide screen wall
New Orleans permit records name Paul Joseph Thibodaux, Douglas Anthony Guthans and Leon Coy Thomas as the contractors on this project, among 4 contractors in all.
The property owner is included with Pro.
7 permits issued Dec 17 – May 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In New Orleans, biggest first.
| applied May 18 |
#26-14930-HVAC Mechanical HVAC · HVAC Replace RTU6 & RTU8 Status: Permit Issued |
| Douglas Anthony Guthans |
| $17.9K |
| applied Nov 5 | #25-34650-SERV Electrical Service / Circuit / Feeder · SERV Temporary disconnect from Entergy to swap out main disconnect of building and reconnect same night. Status: Finaled | Paul Joseph Thibodaux | $2K |
| applied Oct 3 | #25-30635-SERV Electrical Service / Circuit / Feeder · SERV Temporary disconnect from Entergy to swap out main disconnect of building and reconnect the same night. Status: Finaled | Paul Joseph Thibodaux | $2K |
| applied Aug 26 | #25-26070-SERV Electrical Service / Circuit / Feeder · SERV Have Entergy disconnect utility feeders to building at pad mounted transformer. Allow time for removal of temp gear, installation of new gear and inspection before reconnecting building to utility power on same night. Status: Finaled | Paul Joseph Thibodaux | $100K |
| applied Aug 20 | #25-25362-EGEN Permanent Generator · EGEN Install (2) 600kW diesel Gensets on exterior of building with new ATS gear, new main service disconnect and new main distribution panel being installed on interior of building. Status: Finaled | Paul Joseph Thibodaux | $900K |
| applied Oct 3 | #24-30249-EGEN Permanent Generator · EGEN Install (2) 600kw Generators w/ fuel oil tank & provide screen wall Status: Finaled | Leon Coy Thomas | $2.9M |
| applied Jun 11 | #24-17997-ACCS Accessory Structure · ACCS COX COMMUNICATIONS MID CITY REPLACEMENT GENERATORS Status: Permit Issued | National Power, LLC | $2.9M |