Get ProEvery project in every city · from $79/mo
Get Procommercial project · New Orleans, LA
Commercial General Building, Electrical, Hvac/Mechanical, Sign work permitted November 4, 2024, with 19 permits through August 20, 2026, declaring $3,276,332 of work. Contractor on record: Douglas Anthony Guthans.
Get new commercial permits in New Orleans, free weekly email
The Museum of Illusions is a visual, sensory, and educational experience designed to engage your sense of wonder and shift your perspective through the science behind optical illusions. This museum will be an interior only build within the existing space provided.
New Orleans permit records name Douglas Anthony Guthans, Mayer Building Company and Buras Neon And Signs Inc as the contractors on this project, among 10 contractors in all.
The property owner is included with Pro.
19 permits issued Nov 4 – Aug 20, newest first.
| Issued |
|---|
In New Orleans, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied Aug 12 | #26-23193-SATT Attached Sign · SATT AFTER THE FACT Installation of one 9'-10" x 20" wall-mounted sign for an ice cream store as per plans. NO ADDITIONAL SIGNS ARE TO BE INSTALLED. Status: Permit Issued | Buras Neon And Signs Inc | — |
| applied Dec 3 | #25-37388-EVAC Electrical Vacancy · EVAC ELECTRICAL VACANCY Status: Finaled | Michael Jonathan Lee | $550 |
| applied Oct 20 | #25-32734-FGAS Mechanical Fuel Gas · FGAS Test and Inspect Existing Gas Line Status: Finaled | Douglas Anthony Guthans | $800 |
| applied Oct 31 | #24-33390-SATT Attached Sign · SATT New sign for tenant space at 600 Decatur Street. Status: Permit Issued | Not published | — |
| applied Oct 14 | #25-32153-FGAS Mechanical Fuel Gas · FGAS Testing and Inspecting existing gas line. Status: Permit Issued | Douglas Anthony Guthans | $800 |
| applied Aug 28 | #25-26205-SERV Electrical Service / Circuit / Feeder · SERV Install new 400-amp service. Run conduits for 4 new AHU's. The work is for the Landlord portion of a new tenant contract. No meter release required, meter will be on the tenant's electrical contractor. My work is for thew construction of the service only. Status: Finaled | Wesley James Rau | $24.7K |
| applied Aug 1 | #25-23411-HVAC Mechanical HVAC · HVAC Install new HVAC equipment for the Museum of Illusions Status: Finaled | Mayer Building Company | $199K |
| applied Jul 25 | #25-22331-ERPR Electrical Repair / Replacement / Addition · ERPR Relocate Lighting add outlets under the hood add circuits on prep line and rework switches as necessary Status: Finaled | Not published | $42K |
| applied Apr 25 | #25-12524-RNVN Renovation (Non-Structural) · RNVN Interior work only to create shell space for future tenant. Includes (4) new HVAC Units (no distribution), demising wall and, new electrical service only. The space will not be occupied after construction until tenant build out is complete. No exterior work, no change of use, NO USE OR OCCUPANCY Status: Permit Issued | AHG Services, LLC | $160K |
| applied May 2 | #24-12977-HVAC Mechanical HVAC · HVAC Replacing both of the existing cooling towers located at the Jax Millhouse. The cooling towers are located inside of a mechanical room. Status: Finaled | Douglas Anthony Guthans | $195K |
| applied May 5 | #25-13652-RNVN Renovation (Non-Structural) · RNVN Renovation of an existing 10,200 gross SF reception venue on the 4th floor of the shops at Jax Brewery (Former Riverview Room) into a new reception venue. No change in use. No exterior work under this permit. Status: Finaled | Jos. R. Labadot | $296K |
| applied Jul 8 | #25-20513-ERPR Electrical Repair / Replacement / Addition · ERPR Installation of the new circuitry for Museum of Illusions visual educational experience. Status: Finaled | Mayer Building Company | $364K |
| applied Mar 19 | #25-06547-RNVN Renovation (Non-Structural) · RNVN The Museum of Illusions is a visual, sensory, and educational experience designed to engage your sense of wonder and shift your perspective through the science behind optical illusions. This museum will be an interior only build within the existing space provided. Status: Finaled | Mayer Building Company | $1.4M |
| applied Dec 9 | #24-36601-HVAC Mechanical HVAC · HVAC Mechanical work required for the interior updates Status: Inspections Finaled | Douglas Anthony Guthans | $7.3K |
| applied Jun 26 | #25-19492-ECOA Change of Address · ECOA 25-06547-RNVN Business Use, 19 Suites. ADD 600 Decatur St Ste 101 New Orleans, LA 70130 (AM12776230) KEEP 600 Decatur St Ste 102 New Orleans, LA 70130 (AM12776303) ADD 600 Decatur St Ste 104 New Orleans, LA 70130 (AM12776301) KEEP 600 Decatur St Ste 106 New Orleans, LA 70130 (AM12136185) KEEP 600… Status: Finaled | Not published | — |
| applied Mar 18 | #25-08455-ETMP Temporary Generator · ETMP Setting up Electrical for French Quarter Festival 2025 in Jax Brewery Parking Lot. Status: Finaled | William J. Shelton Jr. | — |
| applied Dec 13 | #22-32293-RNVN Renovation (Non-Structural) · RNVN Electrical permit/VCC approval request for: installation of access control entry system at the Shops at JAX Brewery mall Toulouse entrance and related work on interior access control system. Status: Permit Issued | Not published | $21.8K |
| applied Nov 5 | #24-33748-ERPR Electrical Repair / Replacement / Addition · ERPR This permit is for the demo of the Mezzanine bathrooms, ADA Bathrooms and interior public space finishes. New electrical fixtures and devices only will be installed once finish work is complete. Status: Finaled | Ryan Carl Orgeron | $25K |
| applied Jul 12 | #24-21363-RNVN Renovation (Non-Structural) · RNVN Interior finish updates. Scope of work includes renovating existing mezzanine bathrooms, ADA bathrooms, and interior public space finishes. No change of use or occupancy in this project. No additional plumbing fixtures are being added in this renovation. No electrical circuits are being added,… Status: Permit Issued | The Lemoine Company | $552K |