Get Procommercial project · Nashville, TN
Commercial General Building, Roofing work permitted December 16, 2024, with 18 permits through September 30, 2026, declaring $115,890,378 of work.
Structural frame and foundation, for 2 story tower expansion to existing hospital. Includes a powerhouse expansion, 4 OR's, 14 bed ICU, and 30 bed PCU. Separate permit required for 02 Park relocation. Third Party Review by Scott Berg SFMO #1281021737. bb poc andrew pieri MIP
Nashville’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
18 permits issued Dec 16 – Sep 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Apr 10 | #2026030478 Building Commercial - Rehab Dietary Renovation & Expansion • Renovated Kitchen Service Area • Expansion of Storage and Coolers • Expansion of Servery • New offices for Kitchen Staff • New AHU to serve Kitchen in adjacent Mechanical room Gift Shop Relocation • Relocation of Gift Shop to existing Office area • Modifications to… | Not published |
Commercial and multifamily, biggest first.
| $8M |
| applied Jun 8 | #2026047933 Building Commercial - Rehab to conduct renovations to nuclear medicine for equipment change. no change to footprint. | Not published | $926K |
| applied Jun 15 | #2026050261 Building Commercial - Addition Addition to existing hospital for a two-story SPD Expansion on the 1st Floor & Mechanical Penthouse on the 2nd floor above the 1st floor addition. The 2nd floor Mechanical Penthouse will not be accessed by the public its only for the employees for maintenance. See attached plans for reference.… | Not published | $8.9M |
| applied Apr 20 | #2026033173 Building Commercial - Tenant Finish Out Permit request is for a finish out to level 3 of the 3story tower that is being constructed for TriStar skyline medical center. Phase 1 includes the buildout of the third floor that is currently under construction (see permit 2025015543). The floor will include 36 MedSurg Beds with staff and… | Not published | $4.2M |
| applied Apr 24 | #2026034823 Building Commercial - Rehab to conduct renovations for 1st floor decontamination and sterile storage area. no change to footprint. MIP Third Party Review by Rick “Kyle” Melson SFMO #1309561631. | Not published | $500K |
| applied Apr 1 | #2026027541 Building Commercial - Rehab to conduct renovations to relocate gift shop for skyline hospital. no change to footprint. | Not published | $338K |
| applied Mar 3 | #2026018183 Building Commercial - Rehab To conduct interior renovations for existing tenant; TRISTAR SKYLINE MEDICAL CENTER (hospital). To include renovation of an existing IMAGING CORE. No change in use. No change to exterior building/roof lines or footprint. | Not published | $1.9M |
| applied Mar 23 | #2026024416 Building Commercial - Roofing / Siding Remove the existing roof system down to deck, install new R30 insulation and roof membrane. POC: Isaac Guzman 615.922.0532 **Stamped Plans in City Works** | Not published | $1.8M |
| applied Jan 8 | #2026001800 Building Commercial - Amend Permit Request to amend building permit #2025015543. This is to add a 25,500 SF new third floor shell space to the current permit for the Bed Tower and Surgery Expansion project at TriStar Skyline Medical Center. The project currently under construction includes a new two-story patient bed tower, and an… | Not published | $9M |
| applied Dec 18 | #2025105339 Building Commercial - Rehab To conduct interior renovations for existing tenant, TRYSTAR SKYLINE MEDICAL CENTER (hospital). To include renovations to convert existing ENDO and ENDO Processing room to ENDO Scope Processing, Scope Storage and Scope Decontamination Room. No change in use. No change to exterior building/roof… | Not published | $407K |
| applied Feb 24 | #2025015543 Building Commercial - New to construct 2 story tower expansion to existing hospital. will consist of 4 OR's, 14 bed ICU, and 30 bed PCU and O2 park relocation. Third Party Review by Scott Berg SFMO #1281021737. MIP bb poc andrew pieri | Not published | $33.5M |
| applied Aug 18 | #2025070152 Building Commercial - Rehab to conduct renovations to portion of existing building for patient discharge lounge. no change to footprint. bb poc marc rowland | Not published | $495K |
| applied Sep 8 | #2025075922 Building Commercial - Addition For TRISTAR SKYLINE (hospital), Tower Expansion project. Scope of work provided by applicant; install new fuel oil system for the additional boiler and generators added for this project. Including new tanks, day tanks, polishers, and pumps. See previous project permits; CACG-2025009618,… | Not published | $1.2M |
| applied Jul 7 | #2025057457 Building Commercial - Rehab Replacement of existing X-ray equipment with new. POC: Sandy Moran 615-974-3999 | Not published | $350K |
| applied Jul 16 | #2025060597 Building Commercial - Rehab To conduct interior renovations for existing tenant; TRISTAR SKYLINE MEDICAL CENTER (medical office). To include limited demolition and renovation of existing suite G30, create new exit for life safety compliance. No change in use. No change to exterior building/roof lines or footprint. Poc: Marc… | Not published | $50K |
| applied May 15 | #2025041607 Building Commercial - Rehab To conduct general renovations for existing tenant; TRISTAR SKYLINE MEDICAL CENTER (hospital). Existing cath lab room to receive new bi-plane equipment. Equipment swap. No change in use. No change to exterior building/roof lines or footprint. Poc: Greg Deason 615-636-9899… | Not published | $439K |
| applied Feb 3 | #2025009618 Building Commercial - Structural Frame Structural frame and foundation, for 2 story tower expansion to existing hospital. Includes a powerhouse expansion, 4 OR's, 14 bed ICU, and 30 bed PCU. Separate permit required for 02 Park relocation. Third Party Review by Scott Berg SFMO #1281021737. bb poc andrew pieri MIP | Not published | $43.5M |
| applied May 10 | #2024043110 Building Commercial - Rehab Existing interior coffee space at first floor lobby to be converted to a new Starbucks coffee with minor lobby renovations. No expansion of building footprint. POC: Mark E. Watson 615-426-6207 bb poc sandy moran | Not published | $375K |