Get ProEvery project in every city · from $33/mo
Get Procommercial project · Minneapolis, MN
Commercial General Building, Hvac/Mechanical, Plumbing work permitted June 30, 2025, with 6 permits through July 15, 2026, declaring $6,354,500 of work. Contractor on record: Thelen Heating and Roofing Inc.
HVAC system converting existing steam to chilled beam system. This application is just for hydronic system per approved plans.
Minneapolis permit records name Thelen Heating and Roofing Inc, Air Mechanical Inc and Bert Lichen (T-Mobile) as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
6 permits issued Jun 30 – Jul 15, newest first.
| Issued | Permit | Contractor | Value |
|---|
In Minneapolis, biggest first.
#BLDG1187806 Commercial · Remodel At Antenna Level: Remove (3) existing (Nokia Aehc) panel antennas, (1) per sector. Install (3) new (Nokia Avha) panel antennas, (1) per sector. Communication Tower Antenna Replacement/Addition Engineer: Tim Alexander #61982 SEPARATE PERMITS (ST Status: Issued | Bert Lichen (T-Mobile) | $500 |
#BLDG1172776 Mechanical · ComMFDNR HVAC system converting existing steam to chilled beam system. This application is just for hydronic system per approved plans. Status: Issued | Area Mechanical LLC | $3.9M |
#BLDG1162785 Mechanical · ComMFDNR Ventilation work and equipment only, piping and piping equipment by others. Status: Issued | Thelen Heating and Roofing Inc | $2.1M |
#BLDG1160801 Commercial · Remodel RENOVATION OF EXISTING BUILDING (SABATHANI COMMUNITY CENTER) NEW GEOTHERMAL SYSTEM, NEW MECHANICAL, STRUCTURAL WORK, DOORS. NO CHANGE TO EXITING. NEW 1 HOUR SHAFT. (JJL) certificate of occupancy required: no special inspections required: y Status: Issued | Thelen Heating and Roofing Inc | $306K |
#BLDG1132001 Plumbing · ComMin sabathani community center run gas line from roof Status: Issued | Air Mechanical Inc | — |
#BLDG1128869 Plumbing · ComMin We are venting a water heater to the Community center so that they are able to use it for training/ teaching purposes. We are not running a waterline to it. HVAC side will be installing a gas line to the water heater. Status: Issued | Air Mechanical Inc | — |