Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Minneapolis, MN
Multifamily General Building, Hvac/Mechanical, Plumbing work permitted November 3, 2025, with 4 permits through May 22, 2026, declaring $35,652 of work. Contractor on record: Standard Heating and Air Conditioning Inc.
(DMH-Pdox) BATHROOM REMODEL IN TOWNHOME UNIT. REPLACE FIXTURES IN SAME LOCATIONS. NO WINDOW REPLACMENT. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WATER-RESISTANT GYPSUM BACKING BOARD
Minneapolis permit records name Standard Heating and Air Conditioning Inc, Zahler Heating and Air Conditioning Inc and Diversified Plumbing and Heating Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 3 – May 22, newest first.
In Minneapolis, biggest first.
| Issued |
|---|
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#BLDG1181274 Mechanical · ExistRes Installing a 2 head ductless mini split system Status: Closed | Standard Heating and Air Conditioning Inc | — | |
#BLDG1153253 Mechanical · ExistRes Vent bath fan, 110 cfm max. Status: Closed | Zahler Heating and Air Conditioning Inc | — | |
#BLDG1153022 Plumbing · Res Up stairs Bathroom remodel sink, toilet, tub/shower combo Status: Closed | Diversified Plumbing and Heating Inc | — | |
#BLDG1140953 Res · Remodel (DMH-Pdox) BATHROOM REMODEL IN TOWNHOME UNIT. REPLACE FIXTURES IN SAME LOCATIONS. NO WINDOW REPLACMENT. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHOWER LOCATIONS. WATER-RESISTANT GYPSUM BACKING BOARD Status: Closed | Red Door Design | $35.7K |