Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Minneapolis, MN
Multifamily General Building, Hvac/Mechanical, Plumbing work permitted October 31, 2024, with 7 permits through August 6, 2026, declaring $42,706 of work. Contractor on record: Able Plumbing LLC.
(DMH-ProjectDox) FINISH FOR NEW 222 SQFT. MAIN FLOOR EFFICIENT DWELLING UNIT IN EXISTING 3 UNIT DWELLING. INSTALL NEW KITCHEN AND BATHROOM. 2 UNITS AT 1ST FLOOR. 2 UNITS AT 2ND FLOOR. TOP FLOOR IS BEDROOMS & BATHRM FOR UNIT 2A. COMMO
Minneapolis permit records name Able Plumbing LLC, Steve Booth Construction Inc and CenterPoint Energy Resource Corp as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Oct 31 – Aug 6, newest first.
| Issued | Permit | Contractor |
|---|
In Minneapolis, biggest first.
| Value |
|---|
#BLDG1194524 Plumbing · Res METER MOVE Q2 - 2026 BATCH #23 Status: Issued | CenterPoint Energy Resource Corp | — | |
#BLDG1156518 Mechanical · ComMFDRR Install Boiler emailed applicant on required license flag - 2025-12-10 - lea Status: Issued | Norse Heating and Air Inc | $15K | |
#BLDG1111777 Plumbing · Res 2 toilets, 1 tub/shower, 1 tub, 2 vanities, kitchen sink Status: Closed | Able Plumbing LLC | — | |
#BLDG1093267 Commercial · Remodel (DMH-ProjectDox) FINISH FOR NEW 222 SQFT. MAIN FLOOR EFFICIENT DWELLING UNIT IN EXISTING 3 UNIT DWELLING. INSTALL NEW KITCHEN AND BATHROOM. 2 UNITS AT 1ST FLOOR. 2 UNITS AT 2ND FLOOR. TOP FLOOR IS BEDROOMS & BATHRM FOR UNIT 2A. COMMO Status: Closed | Steve Booth Construction Inc | $20K | |
#BLDG1093548 Commercial · Remodel STRUCTURALLY IMPROVE EXISTING GARAGE. 2ND LEVEL SPACE IS STORAGE ONLY. NOT HABITABLE. (JJL) ENGINEER: MARK HOSTETLER - #19906 Status: Issued | Steve Booth Construction Inc | $15K | |
#BLDG1096274 Plumbing · Res kitchen sink, dishwasher, gas range Status: Closed | Able Plumbing LLC | — | |
#BLDG1089062 Commercial · Remodel (DMH-ProjectDox) FRAME FOR NEW SHOWER STALL AT 3RD FLOOR APT UNIT OF 3 UNIT BLDG. AND REPLACE 3 DOOR LOCATIONS. NO DISRUPTION TO EXISTING FIRE/SOUND SEPARATION. INSTALL FIBER-CEMENT OR GLASS MAT GYPSUM BACKERS FOR CERAMIC TILE FINISHES AT BATHTUB/SHO Status: Closed | Studio Rebus Inc | $7.7K |