Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Miami, FL
Multifamily General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing, Roofing work permitted July 2, 2025, with 17 permits through July 10, 2026, declaring $3,274,480 of work. Contractor on record: Ambar Technologies LLC.
MULTI-FAMILY (RENTAL)
Miami permit records name Ambar Technologies LLC, GP US Construction LLC and SR Tech & Services Corp as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
17 permits issued Jul 2 – Jul 10, newest first.
In Miami, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Mar 17 | #BD22011133013B001 NEW CONSTRUCTION · RAILINGS - METAL|STAIRS - METAL|LOUVRES RAILINGS - METAL|STAIRS - METAL|LOUVRES Status: Active | GP US Construction LLC | $25K |
| applied Oct 14 | #BD22011133005BR001 NEW CONSTRUCTION · FLAT ROOF|ROOF WATERPROOFING FLAT ROOF|ROOF WATERPROOFING Status: Final | Tectum Systems LLC | $52.1K |
| applied Feb 5 | #BD22011133010E001 NEW CONSTRUCTION · ELECTRICAL FOR FIRE ALARM ELECTRICAL FOR FIRE ALARM Status: Active | SR Tech & Services Corp | $25K |
| applied Jul 24 | #BD22011133002B001 NEW CONSTRUCTION · WINDOWS / DOORS / SKYLIGHT WINDOWS / DOORS / SKYLIGHT Status: Final | Infinite Windows LLC & Infinite Builders LLC | $70K |
| applied Feb 5 | #BD22011133010F001 NEW CONSTRUCTION · NEW FIRE ALARM SYSTEM NEW FIRE ALARM SYSTEM Status: Active | SR Tech & Services Corp | $25K |
| applied Feb 23 | #BD22011133012E001 NEW CONSTRUCTION · TEMPORARY FOR TESTING TEMPORARY FOR TESTING Status: Active | Ambar Technologies LLC | $800 |
| applied Feb 5 | #BD22011133009E001 NEW CONSTRUCTION · LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL LOW VOLTAGE COMPUTER / TV CABLE / PHONE TERMINAL Status: Final | Ambar Technologies LLC | $1.2K |
| applied Feb 2 | #BD22011133008P001 NEW CONSTRUCTION · TEMPORARY TOILETS: SITE INSTALLATION TEMPORARY TOILETS: SITE INSTALLATION Status: Active | Aes Portable Sanitation Inc | $500 |
| applied Oct 20 | #BD22011133006B001 NEW CONSTRUCTION · SHORING / RE-SHORING SHORING / RE-SHORING Status: Active | GP US Construction LLC | $10K |
| applied Nov 17 | #BD22011133007B001 NEW CONSTRUCTION · STRUCTURAL SUPPORT FOR EQUIPMENT STRUCTURAL SUPPORT FOR EQUIPMENT Status: Active | GP US Construction LLC | $3.5K |
| applied May 9 | #BD22011133001L001 NEW CONSTRUCTION · TREE REMOVAL|TREE REPLACEMENT PLANTING (ROW)|TREE REPLACEMENT PLANTING TREE REMOVAL|TREE REPLACEMENT PLANTING (ROW)|TREE REPLACEMENT PLANTING Status: Active | GP US Construction LLC | — |
| applied Aug 5 | #BD22011133003F001 NEW CONSTRUCTION · BACKFLOW PREVENTER|FIRE PUMP|NEW FIRE SPRINKLER SYSTEM|STANDPIPE|WATER SUPPLY / FIRELINE|FIRE DEPARTMENT CONNECTION BACKFLOW PREVENTER|FIRE PUMP|NEW FIRE SPRINKLER SYSTEM|STANDPIPE|WATER SUPPLY / FIRELINE|FIRE DEPARTMENT CONNECTION Status: Active | Patriot Fire Inc | $49.5K |
| applied Aug 5 | #BD22011133004E001 NEW CONSTRUCTION · TEMPORARY FOR CONSTRUCTION <600 AMPS & 240V TEMPORARY FOR CONSTRUCTION <600 AMPS & 240V Status: Final | Ambar Technologies LLC | $1.2K |
| applied May 9 | #BD22011133001MA001 NEW CONSTRUCTION · AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM|INSULATION OF HVAC PIPING AND METAL DUCT|OTHER MECHANICAL PIPING AC CENTRAL / HEATING SYSTEM|SHEET METAL WORK|EXHAUST VENTILATION|FIBERGLASS DUCTWORK|DUCTLESS MINI-SPLIT SYSTEM|INSULATION OF HVAC PIPING AND METAL DUCT|OTHER MECHANICAL PIPING Status: Active | Ambar Technologies LLC | $67.5K |
| applied May 9 | #BD22011133001E001 NEW CONSTRUCTION · A/C CENTRAL|CLOTHES WASHERS|DRYERS|LIGHT SOCKET|NEW METER|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS DOMESTIC|NEW SERVICE|SUB-FEEDS|SERVICE >600 AMPS AND 240V|WATER HEATER / BOILER A/C CENTRAL|CLOTHES WASHERS|DRYERS|LIGHT SOCKET|NEW METER|ROUGH WIRING OUTLETS|RANGE|REFRIGERATORS DOMESTIC|NEW SERVICE|SUB-FEEDS|SERVICE >600 AMPS AND 240V|WATER HEATER / BOILER Status: Active | Ambar Technologies LLC | $518K |
| applied May 9 | #BD22011133001P001 NEW CONSTRUCTION · ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|HOSE BIB |ROUGHING FIXTURE: ICE MAKER|SETTING FIXTURE: ICE MAKER|ROUGHING FIXTURE: KITCHEN SINK|SETTING FIXTURE: KITCHEN SINK|ROUGHING FIXTURE: LAUNDRY TRAY / WASHER|SETTING FIXTURE: LAUNDRY TRAY / WASHER|ROUGHING FIXTURE: LAVATORY|SETTING FIXTURE: LAVATORY|MISCELLANEOUS SIPHON-BREAKERS |ROUGHING FIXTURE: SHOWER|SETTING FIXTURE: SHOWER|ROUGHING FIXTURE: TOILET / WATER CLOSET|SETTING FIXTURE: TOILET / WATER CLOSET|WATER SERVICE: WATER CONNECTION FROM METER|BACKFLOW UP TO 2""|COMMERCIAL BUILDING CONNECTION OUTSIDE |SUB-METER ROUGHING FIXTURE: DISHWASHER|SETTING FIXTURE: DISHWASHER|ROUGHING FIXTURE: DISPOSAL|SETTING FIXTURE: DISPOSAL|ROUGHING FIXTURE: ELECTRIC WATER HEATER|SETTING FIXTURE: ELECTRIC WATER HEATER|HOSE BIB |ROUGHING FIXTURE: ICE MAKER|SETTING FIXTURE: ICE MAKER|ROUGHING FIXTURE: KITCHEN SINK|SETTING… Status: Active | Ambar Technologies LLC | $248K |
| applied May 9 | #BD22011133001B001 NEW CONSTRUCTION · MULTI-FAMILY (RENTAL) MULTI-FAMILY (RENTAL) Status: Active | GP US Construction LLC | $2.2M |