Get ProEvery project in every city · from $33/mo
Get Procommercial project · Mesa, AZ
Commercial General Building, Fire Protection work permitted November 1, 2024, with 4 permits through April 29, 2025, declaring $305,523 of work. Contractor on record: Juzt Construction.
This project consists of the installation of (2) new freestanding shade canopies at an existing education building. 975 SF for the west side canopy and 1,075 SF for the East side canopy. Group U occupancy and type II-B construction. Special Inspections Required for Fabricators, Steel Construction and Driven Deep Foundations. Results in CoC.
Mesa permit records name Juzt Construction, Total Shade LLC and Ecd Systems LLC as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Nov 1 – Apr 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#PMT25-06603 Commercial Permit · Commercial/Industrial Projects New 98 SF playground structure at the east playground area of the existing education building at Red Mountain Community Church. Type VB Construction. Results in CoC Status: C Of C Issued |
| Juzt Construction, Inc. |
| $6.5K |
| applied Feb 18 | #PMT25-03081 Commercial Permit · Commercial/Industrial Projects This project consists of the installation of (2) new freestanding shade canopies at an existing education building. 975 SF for the west side canopy and 1,075 SF for the East side canopy. Group U occupancy and type II-B construction. Special Inspections Required for Fabricators, Steel Construction… Status: C Of C Issued | Total Shade LLC | $202K |
| applied Dec 12 | #PMT24-21600 Commercial Permit · Commercial/Industrial Projects New 450 SF Playground structure at the west playground area of the existing Education Building at Red Mountain Community Church. type V-B construction. Results in CoC. Status: C Of C Issued | Juzt Construction | $29.2K |
| applied Sep 19 | #PMT24-16815 Commercial Permit · Other Commercial Fire alarm - ECD Systems providing a new notifier addressable system. System to be equipped with voice evacuation. Provide addressable duct detectors. Installed by others. System to interface with fire sprinkler riser flow and tamper switches. All cabling designed to be installed free air above… Status: C Of C Issued | Ecd Systems LLC | $67.8K |