Get ProEvery project in every city · from $33/mo
Get Procommercial project · Mesa, AZ
Commercial work permitted April 24, 2025, with 2 permits through June 18, 2025, declaring $72,000 of work. Contractor on record: Enertech Resources LLC.
Modify existing cellular tower by removing (3) antennas, (3) 3/8" control, and (6) 7/8" coax cables and installing (4) antennas, (1) OVP, and (1) 1-5/8" 6 x 12 hybrid cable.
Mesa permit records name Enertech Resources LLC and Mastec Network Solutions as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Apr 24 – Jun 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied May 1 | #PMT25-07950 Commercial Permit · Other Commercial Modify existing cellular tower by removing (3) antennas, (3) 3/8" control, and (6) 7/8" coax cables and installing (4) antennas, (1) OVP, and (1) 1-5/8" 6 x 12 hybrid cable. |
In Mesa, biggest first.
Status: Issued
| Enertech Resources LLC |
| $47K |
| applied Mar 4 | #PMT25-03949 Commercial Permit · Commercial/Industrial Projects AT&T equipment upgrade to an existing cell tower includes adding: 3 10' Mounting Pipes, 6 Crossover Plate Kits, 3 Back to Back RRU Brackets, 3 NNHH-65C-R4 Antennas, 3 AIR 6472 B77G B77M Antennas, 3 4471 B30 RRUs, 3 4478 B12A RRUs, 3 4494 B14/B29 RRUs, 3 4890 B25/B66 RRUs, and removing: 9 Antennas… Status: C Of C Issued | Mastec Network Solutions | $25K |