Get ProEvery project in every city · from $79/mo
Get Procommercial project · Mesa, AZ
Commercial General Building, Electrical, Fire Protection, Roofing work permitted November 12, 2024, with 12 permits through October 19, 2026, declaring $1,000,000 of work. Contractor on record: Spectra Electrical.
Premanufactured storage water tank and fire pump house. Located at the west side of the campus. Work consists of relocating curb, retaining walls, electric, plumbing. Including installation of a diesel engine driven fire pump rated at 2500 gpm at 170 psi. Special inspection required for concrete, masonry, soils, and post installed anchors. Approved with Stipulation: The Fire Pump House shall be provided with a diesel engine exhaust system in accordance with Section 11.5, NFPA 20, 2019 edition. Results in CoC.
Mesa permit records name Spectra Electrical and Jec Contracting Corp. as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
12 permits issued Nov 12 – Oct 19, newest first.
| Issued |
|---|
In Mesa, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
| applied Oct 15 | #PMT26-18784 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES REMOVING THE EXISTING HIGH-PILED STORAGE RACKING LOCATED IN THE PH. I / WAREHOUSE AREA. Status: Finaled - C Of C Required | Not published | — |
| applied May 29 | #PMT26-09978 Commercial Permit · Commercial/Industrial Projects AFP26-00653 THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A COMPACTOR W/ ROLL-OFF BIN IN THE EXISTING TRUCK DOCK OF DSSA / PH. II. EXIST. ELECTRICAL UTILITIES WILL BE MODIFIED (NEW CIRCUIT) FOR THE PROJECT. Status: Issued | Spectra Electrical | — |
| applied May 8 | #PMT26-08888 Commercial Permit · Commercial/Industrial Projects AFP26-00653 THE PROJECT SCOPE INCLUDES MODIFICATIONS TO THE EXISTING 'D7' INFLATOR ASSEMBLY LINE (PMT23-12154) LOCATED IN THE PH. I / PRODUCTION AREA. EXIST. UTILITIES WILL NOT BE MODIFIED FOR THE PROJECT. EXIST. HAZARDOUS MATERIAL QUANTITIES WILL NOT BE INCREASED FROM THOSE PREVIOUSLY PERMITTED… Status: C Of C Issued | Not published | — |
| applied Dec 18 | #PMT25-23337 Commercial Permit · Commercial/Industrial Projects Premanufactured storage water tank and fire pump house. Located at the west side of the campus. Work consists of relocating curb, retaining walls, electric, plumbing. Including installation of a diesel engine driven fire pump rated at 2500 gpm at 170 psi. Special inspection required for concrete,… Status: Issued | Jec Contracting Corp. | $900K |
| applied Dec 9 | #PMT25-22688 Commercial Permit · Commercial/Industrial Projects *Civil Only* Scope of Work includes the following to prepare project site for Fire Pumphouse (w/ pump) and Fire Water Storage Tank Installation (included in future submittal): - Underground Utilities (fire and domestic water) - Finished Grading - Paving and Curbing Status: Issued | Jec Contracting Corp. | $100K |
| applied Jan 7 | #AFP26-00653 Annual Facilities Permit INFLATORS MANUFACTURING FACILITY Status: Issued | Not published | — |
| applied Dec 16 | #PMT25-23204 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES THE RELOCATION OF THE EXISTING "FINISHED GOODS STAGING" AREA (PREVIOUSLY PERMITTED IN COM#PMT21-00454) WITH THE FOLLOWING: 1. RECONFIGURE EXISTING FURNITURE / EQUIPMENT IN THE EXISTING SHIPPING AREA LOCATED IN PH. II / PRODUCTION. 2. RELOCATE EXISTING STEEL MESH… Status: C Of C Issued | Spectra Electrical | — |
| applied Nov 14 | #PMT25-21080 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A NEW ELECTRIC VEHICLE (E/V) CHARGING STATION IN THE PARKING LOT ON THE EAST SIDE OF THE PROPERTY EXIST. ELECTRICAL UTILITIES WILL BE MODIFIED FOR THE INSTALLATION. Status: C Of C Issued | Spectra Electrical | — |
| applied Mar 19 | #PMT25-05027 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES INSTALLATION OF (2) NEW STEEL GUARDRAILS TO INCREASE PEDESTRIAN SAFETY. Status: C Of C Issued | Not published | — |
| applied Jan 23 | #PMT25-01352 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES INSTALLATION OF A 5 TON HVAC UNIT W/ NEW DUCTWORK ONTO AN EXISTING ROOF CURB EXISTING UTILITIES WILL BE MODIFIED TO INCLUDE NEW WORK. Status: C Of C Issued | Not published | — |
| applied Dec 11 | #PMT24-21460 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES THE INSTALLATION OF A NEW ELECTRICAL CIRCUIT TO SERVICE A NEW EXTERIOR ELECTRICAL CART CHARGING OUTLET. EXISTING ELECTRICAL UTILITIES WILL BE MODIFIED FOR THE INSTALLATION Status: C Of C Issued | Not published | — |
| applied Nov 7 | #PMT24-19593 Commercial Permit · Commercial/Industrial Projects THE PROJECT SCOPE INCLUDES REMOVING AND REPLACING THE EXISTING 'BOTTLE FEED' STATION ON THE EXISTING 'A5' INFLATOR ASSEMBLY LINE. EXIST. ELECTRICAL UTILITIES WILL BE MODIFIED (NEW CIRCUIT) FOR THE INSTALLATION. EXISTING HAZARDOUS MATERIAL QUANTITIES WILL NOT BE INCREASED FROM THOSE PREVIOUSLY… Status: C Of C Issued | Not published | — |