Get ProEvery project in every city · from $33/mo
Get Promultifamily project · Cambridge, MA
Multifamily General Building work permitted April 24, 2025, with 3 permits through June 30, 2025, declaring $101,325 of work. Contractor on record: Clean Tech Construction.
Renovate kitchen and bathroom, replace hardwood flooring and repaint all walls in all units. Add laundry hookup in second floor and third floor units. Change unit entry door location according to proposed plan for second and third floor unit.
Cambridge permit records name Clean Tech Construction, Cesar Cortez and gc teng llc as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Apr 24 – Jun 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 27 | #1171910 |
Commercial and multifamily, biggest first.
Building: Alteration and Addition
Residential weatherization and air sealing with the Mass Save Program. No structural changes. Work id: 52088722, 52088886, 52088887.1st Floor - Walls 4" Dense Pack Cellulose, Exterior door weather stripping. 2nd Floor - Walls 4" Dense Pack Cellulose, Exterior door weather stripping.3rd Floor -…
Status: Complete
| Clean Tech Construction |
| $10.3K |
| applied May 22 | #1166428 Building: Alteration and Addition Replace an ol flat roof and put a new rubberofDemolish two chimneus fron the roof to the basemment. Status: Complete | Cesar Cortez | $16K |
| applied Apr 8 | #1159179 Building: Alteration and Addition Renovate kitchen and bathroom, replace hardwood flooring and repaint all walls in all units. Add laundry hookup in second floor and third floor units. Change unit entry door location according to proposed plan for second and third floor unit. Status: Complete | gc teng llc | $75K |
In Cambridge, biggest first.