Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Cambridge, MA
Multifamily General Building work permitted September 29, 2025, declaring $7,500 of work. Contractor on record: Third Dimension.
The Owner observed that the exposed portion of the rear brick foundation wall has started to bow. Accordingly, the Owner wants to stabilize the rear brick wall in place to prevent further bowing. The stabilization work is to install steel straps perpendicular to the floor joists that run parallel to the rear wall, with blocking between these joists. The straps will be anchored with through wall fasteners through the brick wall. In addition, a support column will be added in the Basement below an existing beam which bears on the brick rear wall to relieve a portion of the load.
Cambridge permit records name Third Dimension as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
1 permit issued Sep 29 – Sep 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 16 | #1183748 Building: Alteration and Addition |
Commercial and multifamily, biggest first.
The Owner observed that the exposed portion of the rear brick foundation wall has started to bow. Accordingly, the Owner wants to stabilize the rear brick wall in place to prevent further bowing. The stabilization work is to install steel straps perpendicular to the floor joists that run parallel…
Status: Active
| Third Dimension |
| $7.5K |