Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted November 21, 2024, with 16 permits through October 21, 2026, declaring $364,121 of work. Contractor on record: Derek Sullivan.
Interior tenant fit-out to ( BLDG 4 ) for " Zendo Tattoo Parlor ". *** Digeplan *** ( See - A/P# GC23-9573131 ) *** All separate required mechanical, electrical and plumbing permits must be applied for as needed per permit. *** *** A separate sign permit is required for new sign installation. ***
Buffalo permit records name Derek Sullivan, Williams Plumbing Inc. and All State Fire Equip/Wny (Fp2) as the contractors on this project, among 6 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
Commercial and multifamily, biggest first.
16 permits issued Nov 21 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#PLUM26-9712414 PLUMBING · PLUMBERS MASTER Down spout conductor revision. Conductors to be ran to existing DI before discharging into existing retention pond. | Contractor with Pro | $4K | |
#GC26-9699121 GC · GENERAL CONTRACTOR Interior tenant fit-out to ( BLDG 4 ) for " Zendo Tattoo Parlor ". *** Digeplan *** ( See - A/P# GC23-9573131 ) *** All separate required mechanical, electrical and plumbing permits must be applied for as needed per permit. *** *** A separate sign permit is required for new sign installation. *** | Derek Sullivan | $185K | |
#PLUM26-9687691 PLUMBING · PLUMBERS MASTER Install exterior conductors for gutter drainage. Terminate at existing DI. | Williams Plumbing Inc. | $4K | |
#HEAT26-9687492 HEATING · HEATING CONTRACTOR Installation of 2 Mitsubishi 24K Mini Split systems. | Williams Plumbing Inc. | $13K | |
#IBO26-9673207 INTBLDOUT interior build out of offices & exam rooms for the 935 Seneca St project. this is building #3 *** Digeplan *** | Derek Sullivan | $50K | |
#ELEC26-9673382 ELECTRICAL interior rough & finish work for 935 Seneca St building #3 known as dynamic chiropractic. new service 200 amp | Derek Sullivan | $10K | |
#ELEC26-9673384 ELECTRICAL interior rough & finish including service & fixtures | Derek Sullivan | $10K | |
#ELEC26-9673102 ELECTRICAL install 50 amp generator inlet on exterior of building connect to 200 amp panel. install 50 amp breaker in panel for generator connection. install generator interlock bracket on panel dead front. | Derek Sullivan | $800 | |
#PLUM25-9671604 PLUMBING · PLUMBERS MASTER New plumbing installation for 1 ADA half bath and 1 second floor half bath. Washer and dryer set up with a mop sink. Hand sink on second floor. Tankless water heater. Water service and sewer tie in. | Williams Plumbing Inc. | $15K | |
#HEAT25-9654138 HEATING · HEATING CONTRACTOR Installation of two Mitsubishi mini-split heat pump. New install | Williams Plumbing Inc. | $13K | |
#SIGN25-9651038 SIGN · SIGN BUSINESS New blade sign 2'x 3' *** Digeplan *** | Chad Vosseller | $3K | |
#GC25-9634606 GC · SPECIALTY CONTRACTOR Install customer provided type1 exhaust hood & fire system. ***Digeplan*** ***Project location far west building*** | All State Fire Equip/Wny (Fp2) | $31.8K | |
#PLUM25-9632665 PLUMBING · PLUMBERS MASTER New plumbing for hair salon. Underfloor, rough plumbing and final plumbing. Water and sewer connected 5' outside the building. | Williams Plumbing Inc. | $15K | |
#GC24-9627229 GC · SPECIALTY CONTRACTOR Connection & test of (1) Ansul KH fire system ***Digeplan*** | All State Fire Equip/Wny (Fp2) | $2.5K | |
#ELEC25-9627477 ELECTRICAL · MASTER ELECTRICIAN install 3 phase service and wire bakery to plans | Hot Wired Electrical | $20K | |
#HEAT24-9625767 HEATING · HEATING CONTRACTOR HVAC ALSO MITSUBISHI NTXSSH24 | Donald Marzullo | $29K |