Get ProEvery project in every city · from $79/mo
Get Procommercial project · Buffalo, NY
Commercial General Building, Electrical, Hvac/Mechanical work permitted November 14, 2024, with 5 permits through July 8, 2025, declaring $1,274,750 of work. Contractor on record: Thomas Brady.
Install ballasted roof-top solar array on commercial building. AC size is 499.9kWAC, DC size is 743 kWDC. Array is grid-tied via new electrical equipment to be mounted to exterior of building - National Grid to provide new, dedicated service for solar array. *** a separate electrical permit is required for electrical connections *** *** digeplan **
Buffalo permit records name Thomas Brady, Daniel Fetes and Montante Construction as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Nov 14 – Jul 8, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#HEAT25-9650924 HEATING · HEATING CONTRACTOR Furnace installation | Daniel Fetes | — | |
#ELEC25-9645482 ELECTRICAL · MASTER ELECTRICIAN WIRING FOR SOLAR ARRAY, 800 AMP SERVICE, 277/480 VOLT 3-PHASE 1 METER = $25.00 1 TRANSFORMER | Thomas Brady | — | |
#REP25-9633116 REPAIR · GENERAL CONTRACTOR Install ballasted roof-top solar array on commercial building. AC size is 499.9kWAC, DC size is 743 kWDC. Array is grid-tied via new electrical equipment to be mounted to exterior of building - National Grid to provide new, dedicated service for solar array. *** a separate electrical permit is… | Montante Construction | $1.3M | |
#ELEC25-9631330 ELECTRICAL · MASTER ELECTRICIAN Reconnect/Disconnect to change clear tap in troth ESR #31105062 | Brady Electric Inc | $800 | |
#ELEC24-9624282 ELECTRICAL · MASTER ELECTRICIAN INSTALL METERING, SWITCHGEAR AND SOLAR PANELS 82 PANELS = $246.00 ESR#31011869 | Thomas Brady | — |
In Buffalo, biggest first.