Commercial General Building, Electrical, Plumbing work permitted February 11, 2026, with 4 permits through October 13, 2026, declaring $53,048 of work. Contractor on record: Affordable Electric Services.
Toilet Room Renovations. Increase the size of the toilet room complete with new ceiling, doors, fixtures, finishes & lighting. ***Digeplan ***
Buffalo permit records name Affordable Electric Services, Mechanical Services By Radiant Inc and Peak Construction Group as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
4 permits issued Feb 11 – Oct 13, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#REP26-9709802 REP-PLANS Install EZ Access aluminum modular ramp 36" width, 2 line handrails throughout and 33 feet of ramp along with a 6x6 platform at entry and a 4x4 turning platform mid way at the back entrance of the property | Contractor with Pro | $8.5K | |
#ELEC26-9678913 ELECTRICAL GFI Bathroom lighting circuit Bathroom -line for baseboard heater Outlet for water cooler Re-work of 2 lights | Affordable Electric Services | $3.5K | |
#PLUM26-9677847 PLUMBING · PLUMBERS MASTER Re-pipe of existing bathroom. Adding floor drain and water cooler outside wall of bathroom. | Mechanical Services By Radiant Inc | $5K | |
#IBO26-9672850 INTBLDOUT Toilet Room Renovations. Increase the size of the toilet room complete with new ceiling, doors, fixtures, finishes & lighting. ***Digeplan *** | Peak Construction Group | $36K |