Commercial General Building, Hvac/Mechanical, Plumbing work permitted February 27, 2025, with 4 permits through October 5, 2026, declaring $258,000 of work. Contractor on record: Anthony Hertel Hardware & Plumbing.
Relief cut existing EPDM membrane. Fasten 1.2” Polyiso. Install 60 mil TPO RhinoBond. Install Term Bar and Slip Flash at perimeters. Flash all penetrations as specified.
Buffalo permit records name Anthony Hertel Hardware & Plumbing as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor4 permits issued Feb 27 – Oct 5, newest first.
| Issued |
|---|
Commercial and multifamily, biggest first.
| Permit |
|---|
| Contractor |
|---|
| Value |
|---|
#REP26-9709532 REPAIR · SPECIALTY CONTRACTOR Relief cut existing EPDM membrane. Fasten 1.2” Polyiso. Install 60 mil TPO RhinoBond. Install Term Bar and Slip Flash at perimeters. Flash all penetrations as specified. | Contractor with Pro | $246K | |
#PLUM25-9634706 PLUMBING · PLUMBERS MASTER Provide and install Laars 199,000 Btu 95% floor mount boiler w/ 120 gal indirect water heater | Anthony Hertel Hardware & Plumbing | $12K | |
#HEAT25-9634704 HEATING · HEATING CONTRACTOR Provide and install Laars 199,000 Btu 95% floor mount boiler w/ 120 gal indirect water heater . | Anthony Hertel Hardware & Plumbing | $12K | |
#HEAT25-9634499 HEATING · HEATING CONTRACTOR Provide and install Laars 199,000 Btu 95% floor mount boiler w/ 120 gal indirect water heater -Adapt to existing water lines -Upsize existing gas line to 3/4" and adapt to new boiler. Cap existing 1/2" gas line to second tank -Run new PVC exhaust to exterior, either through rear wall with new… | Anthony Hertel Hardware & Plumbing | $12K |