Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Baltimore, MD
Multifamily General Building, Fire Protection, Roofing work permitted December 5, 2025, with 3 permits through October 28, 2026, declaring $315,000 of work.
822 N Fulton Ave: Renovation of existing 3 story rowhouse for 3 dwelling units. As per plans and as per code.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued Dec 5 – Oct 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-003507 Fire protection interior trades: Install a new 13R sprinkler system in the existing house with 3 new apartments and 3 floors above ground | Not published | $10K | |
#BCCM-25-002438 Building 822 N Fulton Ave: Renovation of existing 3 story rowhouse for 3 dwelling units. As per plans and as per code. |
| Not published |
| $275K |
#BRCM-25-022805 Roofing 822 N FULTON AVE TEMPORARY BUILDING PERMIT.: REPLACE ALL WINDOWS SAME SIZE AND SAME LOCATION, REPLACE 3 EXTERIOR DOORS,REPAIR OR REPLACE TURCH ROOFING AS PER CODE, INTERIOR DEMOLITION CATEGORY II, TO ACCOMMODATE R30 INSULATION AND R60 IN ATTTIC AREAS, INSTALL DRYWALL, FLOORING, INTERIOR DOORS,… | Not published | $30K |