Commercial General Building, Fire Protection, Hvac/Mechanical work permitted August 20, 2025, with 10 permits through September 28, 2026, declaring $920,900 of work.
JHU MT Washington Campus: Boiler Replacement, Phase 2
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
10 permits issued Aug 20 – Sep 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-004036 Fire protection Octagon Building Revision: Revision to existing BCCM-25-004059 for sprinkler pipe layout change, heads remain the same 32 | Not published | $1K | |
#BCCM-25-002629
HVAC / Mechanical
JHU MT Washington Campus: Boiler Replacement, Phase 2
| Not published |
| $296K |
#BCCM-26-000526 Building Whiting School Expansion into Marbury: UPS Replacement - installing new 200 amp panel board, installing 14 L6-30R receptacles and surge protectors Address also known as 6225 Smith Avenue Baltimore MD 21209 | Not published | $175K |
#BCCM-25-004059 Fire protection Octagon Building: Add/Replace 32 sprinkler Heads, demolish and replace dry pipe system that protects the ground and second floor exterior canopies | Not published | $51K |
#BCCM-26-000531 HVAC / Mechanical MT Washington boiler replacement: Run conduit and pull wire for new boiler and circulating pump | Not published | — |
#BCCM-25-003175 Building AT&T Site "MOUNT WASHINGTON CAMPUS JHU": AT&T is removing (9) existing antennas and (12) existing RRHs, to install (9) new antennas and (12) new RRUs. As per plans as per code. Please amend this permit application to add all required licensed professionals before any work can begin. | Not published | $20K |
#BCCM-25-003996 Fire protection JHU McAuley Fitness: Modify existing fire alarm system to add (5) strobes, (7) horn / strobes, and (1) module. as per plans as per code. A 3rd party review has already been completed. | Not published | $8K |
#BCCM-25-003674 Fire protection JHU FITNESS CENTER: 3RD PARTY FIRE SPRINKLER REVIEW COMPLETED - RELOCATE 6 SPRINKLER HEADS AS PER CODE LARGEST PIPE SIZE 1" Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | Not published | $5K |
#BCCM-25-001618 HVAC / Mechanical JHU MT Washington Campus: Boiler Replacement AS PER PLANS AS PER CODE | Not published | $195K |
#BCCM-25-001170 Fire protection 5801 Smith Avenue - Suite 1100 - McAuley Fitness Interior: Second generation tenant improvement consisting of all new flooring and paint throughout. Reconfiguration of locker room entries to omit accessing current fitness room through locker rooms and addition of new double doors into the fitness… | Not published | $171K |