Commercial General Building, Demolition, Electrical, Fire Protection work permitted December 17, 2024, with 18 permits through September 4, 2026, declaring $7,214,630 of work.
Burton Pavilion Switchgear Replacement: **** This project is to replace the existing single-ended 1,000 kVA substation serving the Burton Pavilion with a new double-ended service to support the building. The existing service is 13.2 kV fed from the campus feeders. The new service will be fed from the FSK building, 480V service. This work will be performed in multiple phases to minimize disruption to the Burton Pavilion building. The project is primarily electrical in nature and provides: ***** SCOPE OF WORK: ---- TRADES ----- - 500 kVA dry type transformers, switchgear, switchboards, and…
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
18 permits issued Dec 17 – Sep 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-004017 Other Gate Job: Remove existing card reader gate equipment . disconnect and reconnect 120 volt equipment. |
| Not published |
| $5K |
#BCCM-26-001166 Electrical Burton Pavilion Switchgear Replacement: **** This project is to replace the existing single-ended 1,000 kVA substation serving the Burton Pavilion with a new double-ended service to support the building. The existing service is 13.2 kV fed from the campus feeders. The new service will be fed from… | Not published | $4M |
#BCCM-26-001375 Building JH BAYVIEW 3T MRI: REVISION 1 - ORIGINAL PERMITS - BCCM-26-000060 & 251028 3RD PARTY REVIEW - RICK ARVIN ALL BRANCH LINES TO BE REPLACE WITH NEW PIPE. NO LINES ARE TO RUN OVER NEW EQUIPMENT | Not published | $500 |
#BCCM-26-000060 Fire protection JH BAYVIEW 3T MRI: BFPE is to add and relocate sprinkler heads for the redesign of the tenant space. Existing system is to be re-used as much as possible, all material within the MRI room is to be non-ferrous. | Not published | $41.4K |
#BCCM-25-001738 Demolition JHBMC 3T MRI Replacement: SCOPE OF WORK: ------ INTERIOR ALTERATIONS (EQUIPMENT) -------- Replacement of an existing MRI with new MRI Equipment at the Johns Hopkins Bayview Medical Center Francis Scott Key Pavilion. Project includes demo and new construction for renovating the interior finishes of… | Not published | $1.5M |
#BCCM-25-002912 Building 18190 - JHHS FSK Biplane Renovation: Installation of Telecom cabling. 45 dual locations, total of 100 cables | Not published | $65K |
#BCCM-25-002980 Building JH Bayview First FLoor AA Building: Install 25 low voltage Temperature Control devices | Not published | $10K |
#BCCM-25-002981 Other JHH core labs: install 25 low voltage temperature control devices | Not published | $5K |
#BCCM-25-000285 Fire protection Johns Hopkins Bayview Bi-Plane Fire Alarm: Install Fire Alarm System for referenced project consisting of: 1 PAD Panel, 5 Speaker Visual devices, 4 visual devices, 3 speakers, 2 smoke detctors, 1 door holder with relay. | Not published | $10K |
#BCCM-25-001031 Building 300307418 JHBMC Neuro Biplane: Install (2) new free eqress access control doors in this existing building. Approved For Work only. Subject to the permitted uses and regulations under the provisions of the Zoning Ordinance. | Not published | $11.6K |
#BCCM-25-001896 Demolition JHM FSK Patient Bathrooms: Demo 60 Light fixtures and install 60 new light fixtures. | Not published | $18.5K |
#COM2024-01728 Building JHH OR 15: [4940 EASTERN AVE] RENOVATION OF AN EXISTING OPERATING ROOM. SCOPE TO INCLUDE NEW MAJOR MEDICAL EQUIPMENT, FINISHES, AND CASEWORK. AS PER PLANS AS PER CODE. | Not published | $1.5M |
#BCCM-25-000232 Fire protection JH BAYVIEW FSK BIPLANE: The scope of work includes, BFPE adding and relocating quick response concealed sprinkler heads to provide the proper coverage in the newly renovated space. BFPE will follow the existing pipe schedule on site. | Not published | — |
#COM2024-01121 Other JHBMC AA CORE LAB FA RIP: ADDING 3 ANNUNCIATING DEVICES TO EXISTING LOOP, AS PER PLANS AS PER CODE. | Not published | — |
#COM2024-01273 Fire protection JHBMC AA CORE LAB FA SHELL & STORAGE: SHELL SPACE AND SLIDE STORAGE FIRE ALARM RENOVATION AS PER PLANS AS PER CODE. | Not published | — |
#COM2024-93197 Other 1150 BVMC MFL: INSTALL (25) # FIXTURES/DEVICES, (9) # BRANCH CIRCUITS/FEEDERS AS PER CODE. | Not published | $10K |
#COM2024-03350 Fire protection removing the existing branchlines back to the main in the area of work. bfpe will install new branch lines and concealed sprinklers (25 heads) to provide the proper coverage in the newly renovated space as per plans as per code. | Not published | $20.6K |
#COM2024-91775 Electrical amend permit: add electrical contractor . (original permit:com2024-01319:scope of work: ------- level ii interior alterations ------- renovation, repair and renewal of all associated systems in the francis scott key pavilion, administration imaging offices, prep and recovery room. the renovation… | Not published | — |