Get ProEvery project in every city · from $79/mo
Get Procommercial project · Baltimore, MD
Commercial Demolition, Fire Protection, Sign work permitted May 26, 2026, with 3 permits through September 1, 2026, declaring $30,500 of work.
Reparon EW: REPLACEMENT OF EXISTING GLAZING TO BE NEW ALUMINUM STOREFRONT. SCOPE OF WORK INCLUDES DEMOLITION OF EXISTING GLAZING AND REMOVAL OF SIGN BAND. NEW EXTERIOR PAINT. NO NEW SIGNAGE. REPAIR REPLACEMENT OF SURROUNDING AREAS IN KIND. This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
3 permits issued May 26 – Sep 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-003907 Fire protection 3902 Eastern Ave – Fire Damage Interior Demolition: Interior demolition due to fire damage. Remove fire-damaged interior wall finishes, non-load-bearing partitions, ceilings, flooring and debris within the first-floor commercial space. Limited demolition at the second-floor apartment bathroom… |
| Not published |
| $3.5K |
#BCCM-26-001589 Demolition Reparon EW: REPLACEMENT OF EXISTING GLAZING TO BE NEW ALUMINUM STOREFRONT. SCOPE OF WORK INCLUDES DEMOLITION OF EXISTING GLAZING AND REMOVAL OF SIGN BAND. NEW EXTERIOR PAINT. NO NEW SIGNAGE. REPAIR REPLACEMENT OF SURROUNDING AREAS IN KIND. This property is in an Urban Renewal Plan Area and must… | Not published | $25K |
#BCCM-26-002164 Signs Cellvirepair Wireless: Relocate 2 switches. Install 4 exterior gooseneck lights on a switch. Install dedicated circuit and switch for future sign. | Not published | $2K |