Get Procommercial project · Baltimore, MD
Commercial General Building, Demolition, Fire Protection work permitted May 1, 2025, with 12 permits through September 14, 2026, declaring $1,600,198 of work.
ORIOLES OFFICES PHASE 1: SCOPE OF WORK INCLUDES MINOR DEMOLITION AND INTERIOR ALTERATION TO NON-LOAD BEARING PARTITIONS IN EXISTING UNOCCUPIED SPACE. NO STRUCTURAL MODIFICATIONS REQUIRED AS PER PLAN, AS PER CODE.
Baltimore’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
12 permits issued May 1 – Sep 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCCM-26-003574 Fire protection OPACY (ORIOLES PARK AT CAMDEN YARDS): ONE FOR ONE REPALACMENT OF FIRE PUMP. 3RD PARTY REVIEW. | Not published | $131K |
#BCCM-26-000954 Fire protection Orioles Camden Warehouse Phase 3 Second Floor - Fire Alarm: Add fire alarm devices to existing fire alarm system. This property is in an Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewal | Not published | $35K |
#BCCM-25-004558 Fire protection 25.046 Orioles Warehouse 2: Add fire alarm devices to existing fire alarm system. as per plans as per code. This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit, https://planning.baltimorecity.gov/planning-plans/urban-renewalinformation | Not published | $25.7K |
#BCCM-25-004370 Fire protection Orioles 3rd Floor Reno Phase 2: Add 91/ Relocate 387 sprinklers to accommodate interior modifications on the 2nd & 3rd floors This property is in a Urban Renewal Plan Area and must follow URP guidelines. For more information visit,… | Not published | $35.9K |
#BCCM-25-003828 Demolition ORIOLES OFFICES PHASE 2: SCOPE OF WORK: -------- LEVEL II INTERIOR ALTERATIONS ------- - MINOR DEMOLITION -CAT I - AND INTERIOR ALTERATION WITH MINIMAL STRUCTURAL MODIFICATION TO EXISTING OCCUPIED SPACE. AS PER PLANS AND AS PER CODE. | Not published | $300K |
#BCCM-25-001712 Building Levy Fiber to Warehouse Bar and Grill: New 6-strand fiber optic cable from Levy core to Warehouse Bar and Grill, utilizing existing pathways. | Not published | $5K |
#BCCM-25-003207 Demolition ORIOLES OFFICES DEMO PHASE 2: INTERIOR DEMOLITION TO NON-LOAD-BEARING PARTITIONS IN EXISTING OCCUPIED SPACE 2ND FLOOR AND 3RD FLOOR AS PER PLAN AS PER CODE. *THIS PERMIT IS FOR INTERIOR DEMOLITION ONLY SEPARATE PERMIT WILL BE PULLED FOR ANY INTERIOR RENOVATIONS/TENANT FITOUT | Not published | $15K |
#BCCM-25-002742 Fire protection Orioles Camden Warehouse Offices- Fire Alarm: Adding fire alarm devices to an existing Fire Alarm system. | Not published | $38K |
#BCCM-25-002605 Fire protection Baltimore Orioles Offices 3rd Floor: Modify existing sprinkler system of approx. 183 sprinklers due to new wall and ceiling layout. Add 17 / Relocate 166 | Not published | $13.7K |
#BCCM-25-000193 Other Production Room Receptacles at O's Warehouse 2nd Floor: Two dedicated circuits, each feeding a dedicated receptacle, at O's Warehouse 2nd Floor Production Room | Not published | $1K |
#BCCM-25-001806 Demolition ORIOLES OFFICES PHASE 1: SCOPE OF WORK INCLUDES MINOR DEMOLITION AND INTERIOR ALTERATION TO NON-LOAD BEARING PARTITIONS IN EXISTING UNOCCUPIED SPACE. NO STRUCTURAL MODIFICATIONS REQUIRED AS PER PLAN, AS PER CODE. | Not published | $1M |
#BCCM-25-001122 Demolition Baltimore Oriole's - Phase 1: SCOPE OF WORK: -------- CAT I DEMOLITION --------- Minor demolition to non-load-bearing partitions in existing unoccupied space. No structural modifications required as per plans, as per code. | Not published | — |